Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 238500 - INSTRUMENTATION AND CONTROL FOR HVAC <br />The system shall be complete in all respects including all labor, materials, equipment and services necessary, and <br />shall be installed by personnel regularly engaged in this type of work. The system shall include all appurtenances <br />whether or not specifically implied or expressed herein or on the contract drawings. <br />All electrical signal wiring together with all field control wiring whether a part of the automation system or not shall be <br />provided for all equipment in the mechanical section as a part of the work of this section. <br />Controls shall be installed, connected, checked out, and calibrated by this contractor, complete in all respects <br />Units shall be furnished with packaged control equipment. Wire in strict accordance with manufacturers recommenda- <br />tions, providing any and all wiring and conduit required to connect the various components together. System shall <br />meet all N.C. Energy Code and ASHRAE 90 -89 requirements. <br />Equipment to include all integral safety control devices as required. Supply and exhaust fans shall be "on" at all times <br />when associated areas are in "occupied" mode. <br />Furnish a complete control wiring diagram from the manufacturer including written description and sequence of oper- <br />ation; train in operation and adjustment. <br />All control wiring shall be in accordance with electrical specifications and NEC <br />The system shall be complete in all respects including all labor, materials, equipment, auxiliary relays, power trans- <br />formers, and services necessary, and shall be installed by personnel regularly engaged in this type of work. The sys- <br />tem shall include all appurtenances whether or not specifically implied or expressed herein or on the contract draw- <br />ings. <br />All electrical signal wiring together with all field control wiring whether a part of the automation system or not shall be <br />provided for all equipment in the mechanical section as a part of the work of this section. <br />AHU's and split system units, shall be furnished with packaged control equipment as provided by the manufacturer; <br />and field installed equipment / components, as required. Wire in strict accordance with manufacturer's recommenda- <br />tions, providing any and all wiring and conduit required to connect the various components together. <br />Installation, Submittals and Warranty: <br />Any control devices shall be located for convenient access and function if not specifically located on drawings, includ- <br />ing all conduit and wiring required to be furnished and installed by this contractor. All thermostat and operable con- <br />trols devices shall be located not higher than 48" AFF. <br />Reece, Noland & McElrath, Inc. 238500-2 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.