Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 238100 - HVAC INSULATION <br />B. Semi -Rigid Fiberglass: Apply insulation to equipment shells using weld pins, bonding adhesive, <br />banded and wired in place. Fill all joints, seams and depressions with insulating cement to a smooth, <br />even surface. Cover with reinforcing fabric and 2 coats of mastic. Use vapor barrier mastic on <br />systems requiring a vapor barrier. <br />C. Elastomeric /Polyolefin: Apply full cover coat of adhesive to surface to be insulated, insulation and <br />edge butt joints. Place insulation with edge joints firmly butted pressing to surface for full adhesion. <br />Seal seams and joints vapor tight. <br />D. Equipment Insulation Schedule: Provide equipment insulation as follows: <br />Equipment Insulation Thickness <br />Type <br />Air Handling Unit Casings or attached Rigid Fiberglass 2" <br />component sections not factory insulated <br />Condenser shell only needs to be insulated when condenser is city, lake, or river water cooled or when <br />"free cooling" is used. <br />E. Insulate air handling unit casings, chambers, or plenums (filters, mixing chambers, sound <br />attenuators, etc.) in accordance with requirements of adjacent duct insulation. <br />END OF SECTION 238100 <br />Reece, Noland & McElrath, Inc. 238100-5 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.