Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 237800 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT <br />G. Fasteners: Stainless -steel rivets or self- tapping screws. <br />H. Adhesive: Contact -type permanent adhesive, compatible with label and with substrate. <br />Duct Label Contents: Include identification of duct service using same designations or abbreviations <br />as used on Drawings, duct size, and an arrow indicating flow direction. <br />1. Flow- Direction Arrows: Integral with duct system service lettering to accommodate both <br />directions, or as separate unit on each duct label to indicate flow direction. <br />2. Lettering Size: At least 1 -1/2 inches high. <br />2.5 STENCILLED PAINTED LABELS <br />A. Material: Spray paint suitable for application on piping, ducts, and equipment, both insulated and <br />uninsulated. <br />B. Letter color: Black or other color contrasting with background surface. <br />C. Minimum Label Size: Length and width vary for required label content. <br />D. Minimum Letter Size: At least 1 -1/2 inches high. <br />E. Contents: As described in this section for piping, ducts, and equipment. <br />PART 3 - EXECUTION <br />3.1 PREPARATION <br />A. Clean piping and equipment surfaces of substances that could impair bond of identification devices, <br />including dirt, oil, grease, release agents, and incompatible primers, paints, and encapsulants. <br />3.2 EQUIPMENT LABEL INSTALLATION <br />A. Install or permanently fasten labels on each major item of mechanical equipment. <br />B. Locate equipment labels where accessible and visible. <br />3.3 PIPE LABEL INSTALLATION <br />A. Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine <br />rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed <br />locations as follows: <br />1. Near each valve and control device. <br />2. Near each branch connection, excluding short takeoffs for fixtures and terminal units. Where <br />flow pattern is not obvious, mark each pipe at branch. <br />3. Near penetrations through walls, floors, ceilings, and inaccessible enclosures. <br />4. At access doors, manholes, and similar access points that permit view of concealed piping. <br />5. Near major equipment items and other points of origination and termination. <br />6. Spaced at maximum intervals of 50 feet along each run. Reduce intervals to 25 feet in areas <br />of congested piping and equipment. <br />7. On piping above removable acoustical ceilings. Omit intermediately spaced labels. <br />3.4 DUCT LABEL INSTALLATION <br />A. Install self- adhesive duct labels with permanent adhesive or stenciled painted labels on air ducts. <br />Reece, Noland & McElrath, Inc. 237800-3 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.