Browse
Search
2018-390-E AMS - Northern Campus Moseley Architects Amendment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-390-E AMS - Northern Campus Moseley Architects Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:55:00 PM
Creation date
8/17/2018 11:46:32 AM
Metadata
Fields
Template:
Contract
Date
7/30/2018
Contract Starting Date
8/24/2015
Contract Ending Date
4/30/2021
Contract Document Type
Contract Amendment
Amount
$1,686,400.00
Document Relationships
2015-458-E AMS - Moseley Architects for New Detention Facility Design $1,418,250
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
2015-673-E AMS - Moseley Architects Agreement Amendment
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
R 2018-390 AMS - Northern Campus Moseley Architects Amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 48ED1D41- DA40- 49D1- A586- 23C127C567EF <br />MOSELEYARCHITECTS <br />11430 N. Community House Road <br />Suirr „5 <br />Charlotte, NC 282;7 June 20, 2018 <br />P (704) 540 -3755 <br />RE: Orange County Detention Center — Design Amendment #4 <br />Orange County, North Carolina <br />Mr. Jeff Thompson, Director, Asset Management Services <br />Orange County <br />Post Office Box 8181 <br />131 West Margaret Lane <br />Hillsborough, North Carolina 27278 <br />Dear Jeff: <br />We are pleased to offer this Additional Services Proposal #4 in accordance with <br />our Services Agreement Over $90,000.00 RFQ -No Reimbursable Expenses <br />dated August 24, 2015. These services consist of the following: <br />1. To re -start the Project on the new approved site, an additional Schematic <br />Design (SD) service will be required, but it is anticipated that the base SD <br />"radial" layout generated originally will be used and re- verified for the <br />Project. The previous effort had completed the SD phase, so some re- <br />work is anticipated based upon current needs. <br />2. The Project has incurred cost escalations since 2015 with associated <br />increases in project design overhead. <br />3. The Site / Civil Engineering effort will be all new, with additional work to <br />incorporate the additional future County buildings to be master planned <br />and engineered for the new site. The Additional Services for our civil <br />engineering consultant (Civil Consultants, Inc.) include: cost escalation <br />since 2015; increased onsite area, grading, drainage, utilities; offsite water <br />extension; offsite sewer extension; road widening and adjacent sidewalk; <br />more storm water management; additional landscaping design; land swap <br />coordination; Town of Hillsborough approvals; and additional master <br />planning for the new site. This service includes overall campus rough <br />grading, storm drainage, stormwater management, onsite and offsite utility <br />mains, interior driveway, road widening, erosion control, and perimeter <br />landscaping for the overall campus property, as well as detailed site <br />design, fine grading, parking and service areas, utility connections, interior <br />landscaping, etc. for the jail facility. It does not include detailed site <br />development design for the DEAPR facilities. <br />4. The approximate design schedule is revised as follows starting from notice <br />to proceed from the County: Schematic Design (SD) Phase — 60 days; <br />Design Development Phase (DD) — 90 days; Construction Document <br />Phase (CD) — 120 days; Bidding Phase — 60 days (there may be an early <br />site package and sequential bidding per CMAR input); Construction <br />Designing solutions. Building trust. Enriching lives. <br />
The URL can be used to link to this page
Your browser does not support the video tag.