Browse
Search
Item - Agenda w-Hillsborough 03-22-2004
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 03-22-2004
>
Item - Agenda w-Hillsborough 03-22-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 3:59:55 PM
Creation date
8/14/2018 3:57:19 PM
Metadata
Fields
Template:
BOCC
Date
3/22/2004
Meeting Type
Municipalities
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
USABLE STORAGE <br />(Without Mebane /Graham) <br />volume In ruiiiuii5 <br />Lake Orange <br />Corporation Lake <br />Ben Johnston <br />Total <br />Total Volume <br />427 <br />25 <br />1,9.2 <br />471.2 <br />Usable Volume at <br />341 <br />18.5 <br />10 <br />369.5 <br />Full <br />Present 7/10/86 <br />272 <br />14.8 <br />.8 <br />287.6 <br />At 18" below full <br />80% <br />800 <br />800 <br />USABLE DAYS OF SUPPLY REMAINING <br />FROM JULY 10, 1986 <br />Supply of Three Reservoirs Conservation Assuming Days Left <br />287 If loo saving 3.1 MGD 102 <br />3.6 MGD 88 <br />4.6 MGD 68 <br />287 315 If 15% saving 3.1 MGD 106 <br />3.6 MGD 92 <br />4.6 MGD 72 <br />3.1 (1.6 Hillsborough, .72 Orange - Alamance, .13 Piedmont Minerals, .65 Instream Flow) <br />4.6 (1.6 Hillsborough, .72 Orang - Alamance, .13 Piedmont Minerals, .65 instream flow, 1.50 OWASA <br />3.6 (1.6 Hillsborough, .72 Orange - Alamance, .13 Piedmont Minerals, .65 instream flow, .50 OWASA <br />
The URL can be used to link to this page
Your browser does not support the video tag.