Browse
Search
Item - Agenda w-Hillsborough 03-22-2004
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 03-22-2004
>
Item - Agenda w-Hillsborough 03-22-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 3:59:55 PM
Creation date
8/14/2018 3:57:19 PM
Metadata
Fields
Template:
BOCC
Date
3/22/2004
Meeting Type
Municipalities
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
attached to this agreement and made a part of it. Water users <br />affected by controls and limitations under the water management <br />operations plan are as follows: <br />a) County - release from Lake Orange, Corporation <br />Lake, and Lake Ben Johnston to meet downstream <br />withdrawals and in- stream flow requirements. <br />b) Hillsborough - Lake Ben Johnston withdrawal and <br />reservoir release (as instructed by the County) , <br />and the Hillsborough wastewater treatment plant <br />discharge. <br />c) Orange - Alamance - Corporation Lake withdrawal and <br />reservoir release (as instructed by the County). <br />d) Piedmont Minerals - Eno River withdrawal and <br />discharge. <br />2. Table 1 establishes the maximum allowable surface water <br />withdrawals and minimum flow requirements at, the Eno River <br />Hillsborough gauge, based on the level of Lake Orange. Table 1 <br />was approved by the EMC as a part of the Eno River Water <br />Management Plan. The parties agree (1) to comply with the water <br />withdrawal restrictions shown in Table 1, (2) to keep in- stream <br />flow levels at or above the. minimum required in Table 1, and ( 3 ) <br />to work together to improve water retention in Lake Orange and to <br />maintain operational drawdowns at Corporation Lake and Lake Ben <br />Johnston to improve the total water supply yield of the reservoir <br />system. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.