Orange County NC Website
Dare <br />To <br />from <br />Project <br />4/ 14/05 (Revised) <br />Pam Jones, Director <br />Orange County Purchasing <br />Ken Friedlein, Dixon Weinstein Architects <br />Solid Waste Management Administration Building/ Design Fee Proposal <br />Thank you {or asking Dixon Weinstein Architects for a fee proposal (or archileclural and <br />engineering services associated with the design of the building described in your Request for <br />Qualifications due Aug 12, 2004 and discussed in our interview with you on Aug 26 and in <br />subsequent telephone conversations and emails <br />We are pleased to offer the following regarding design fees for a building of 6,500 -7,000 <br />square feel serving 25-30 people with an anticipated construction cost of $900,000: <br />ARCHITECTURAL DESIGN <br />Programming, basic services, slruclural & basic PME design <br />including sewer lie-in al properly line $73,500 8 0% <br />PME ENGINEERING <br />(High-performance mechanicol system design) <br />CIVIL ENGINEERING <br />Site survey, basic services, water line extension <br />INTEGRATED WATER MANAGEMENT DESIGN <br />Slormwaler and waslewaler monagemenf <br />ALTERNATIVE ENERGY FEASIBILITY <br />Feasibility study and schematic design only <br />Total Design Fees <br />$16, 300 1 8 <br />$23,500 2 6% <br />$ 9, 000 1 3 <br />x.500 0.3% <br />$1 24, 800 14 0 <br />As you suggested, we have removed septic system design from the scope of work and assumed <br />the project will lap on to new sewer extension al the properly line In the even) county does not <br />bring sewer to the project properly, the inlegraled water management design line will increase by <br />$3,000 We would apply $1,500 from the Basic Services Tine to Thal amount, so the net increase <br />in deisgn fee would be $1,500 <br />We have identified design costs associated with waslewaler management and ahernative energy <br />feasibility, which account for approximately $1 1,500 of the fees If These were declined, design <br />fees would Iola) $1 13,300, or 1 2 5% of the construction budge) <br />Also please Hole that This proposal contains provision for a direct driveway connection to Eubanks <br />Road No significant improvements to the existing roadway are anticipated However, should <br />reviewing aulhorilies require upgrades Io the existing road (such as widening and/or addition of <br />a turn Zane, additional engineering and construction funds would be necessary <br />3 <br />25 The Courtyord d3IW Franklin shoot Chopel HiILNC 27516 9199688333 9r99680473 Fox www dixonwcinsloin com <br />