Browse
Search
Agenda - 04-19-2005-9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 04-19-2005
>
Agenda - 04-19-2005-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:19:07 AM
Creation date
8/29/2008 10:16:47 AM
Metadata
Fields
Template:
BOCC
Date
4/19/2005
Document Type
Agenda
Agenda Item
9d
Document Relationships
2005 S Purchasing - Solid Waste Administration Building Architect
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dare <br />To <br />from <br />Project <br />4/ 14/05 (Revised) <br />Pam Jones, Director <br />Orange County Purchasing <br />Ken Friedlein, Dixon Weinstein Architects <br />Solid Waste Management Administration Building/ Design Fee Proposal <br />Thank you {or asking Dixon Weinstein Architects for a fee proposal (or archileclural and <br />engineering services associated with the design of the building described in your Request for <br />Qualifications due Aug 12, 2004 and discussed in our interview with you on Aug 26 and in <br />subsequent telephone conversations and emails <br />We are pleased to offer the following regarding design fees for a building of 6,500 -7,000 <br />square feel serving 25-30 people with an anticipated construction cost of $900,000: <br />ARCHITECTURAL DESIGN <br />Programming, basic services, slruclural & basic PME design <br />including sewer lie-in al properly line $73,500 8 0% <br />PME ENGINEERING <br />(High-performance mechanicol system design) <br />CIVIL ENGINEERING <br />Site survey, basic services, water line extension <br />INTEGRATED WATER MANAGEMENT DESIGN <br />Slormwaler and waslewaler monagemenf <br />ALTERNATIVE ENERGY FEASIBILITY <br />Feasibility study and schematic design only <br />Total Design Fees <br />$16, 300 1 8 <br />$23,500 2 6% <br />$ 9, 000 1 3 <br />x.500 0.3% <br />$1 24, 800 14 0 <br />As you suggested, we have removed septic system design from the scope of work and assumed <br />the project will lap on to new sewer extension al the properly line In the even) county does not <br />bring sewer to the project properly, the inlegraled water management design line will increase by <br />$3,000 We would apply $1,500 from the Basic Services Tine to Thal amount, so the net increase <br />in deisgn fee would be $1,500 <br />We have identified design costs associated with waslewaler management and ahernative energy <br />feasibility, which account for approximately $1 1,500 of the fees If These were declined, design <br />fees would Iola) $1 13,300, or 1 2 5% of the construction budge) <br />Also please Hole that This proposal contains provision for a direct driveway connection to Eubanks <br />Road No significant improvements to the existing roadway are anticipated However, should <br />reviewing aulhorilies require upgrades Io the existing road (such as widening and/or addition of <br />a turn Zane, additional engineering and construction funds would be necessary <br />3 <br />25 The Courtyord d3IW Franklin shoot Chopel HiILNC 27516 9199688333 9r99680473 Fox www dixonwcinsloin com <br />
The URL can be used to link to this page
Your browser does not support the video tag.