Browse
Search
Agenda - SWAB 020805
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 02-08-2005
>
Agenda - SWAB 020805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 3:59:26 PM
Creation date
8/13/2018 3:55:55 PM
Metadata
Fields
Template:
BOCC
Date
2/8/2005
Meeting Type
Work Session
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• financial impacts and funding requirements for the enterprise fund <br />• implementation issues <br />• receive input from the SWAB, the Town's, the public, and the BOCC, and <br />• prepare a recommended revised Plan and have that revised Plan considered and <br />adopted by the three Towns and the BOCC before the next 3 -Year Update to the <br />State required plan is due on June 30, 2006. <br />Suggested Timeline <br />2004 <br />November - December -Solid Waste staff to examine and identify a scope of work and <br />timeline necessary to reexamine and analyze future waste reduction policy (including <br />recyclables collection and processing options). <br />Staff begins information gathering and analysis and discussions with the SWAB that will <br />continue throughout the process. <br />2005 <br />Fe — Staff presents to the BOCC a proposed process and timeline to conduct a <br />study reconsidering the County's long -tern waste reduction strategy, including issues <br />previously raised by the Town of Chapel MR. Staff receives guidance and proceeds to <br />implement approved process /timeline. <br />March — Staff discusses approved process with SWAB and defines and discusses the <br />SWAB's role in the process. (SWAB will discuss as necessary at any scheduled monthly <br />meeting or at a special meeting if desired) <br />March/ Apri1- Work Group meets to receive progress update and review work to date, <br />discuss their role and degree of involvement in the process, and to provide guidance /input <br />to the process. (It is assumed that staff will provide certain communications to each <br />TowsIUNC as a precursor to their selection of representatives) <br />April — Staff provides status update to BOCC. <br />Auguust /S tep ember — Work Group meeting to discuss staff analysis. <br />September - Staff provides status update to BOCC and Town Boards (if desired). Public <br />education conducted on the newly proposed Plan elements. <br />October — SWAB sponsors open forum for citizen input. <br />November/December — Staff submits preliminary draft of recommended revised Plan to <br />Work Group and SWAB. Receives feedback on recommendations. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.