Orange County NC Website
31 <br />2 <br /> <br />to <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />1~9 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />24 <br />27 <br />2S <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />~4 <br />located immediately west of the existing landfill an the north side of Eubanks Road, on a 12.76- <br />acre tract of land. The existing special use permit was approved an May 5, 1997. This included. a <br />construction of a 4,000-square foot vehicle maintenance building, with the processing of yard <br />waste and stone debris on an ongoing basis. A modification to the special use permit was <br />approved on November 17, 1998 by the Board of County Commissioners to add an area to be <br />used for recycling glass and metal cans. The expansion included a 7,500-square foot concrete <br />slab, two open sheds, and 44,000 square feet of additional vehicular surface area. The proposed <br />modification calls for the addition of two buildings that total•6,120 square feet on the existing 7,500- <br />square foot recycling pad that was previously constructed. Also, the modification calls for the <br />construction of an additional 1,125 square feet of concrete pad contiguous to the existing pad and <br />storage of an additional six roll off containers on the site. <br />Landfill Engineer Mike Meagher explained the reasons for the. modifications. He said <br />that the new structures would protect the workers from the sun, rain, etc. The concrete pads would <br />give the trucks better traction instead of tearing up the gravel. <br />Commissioner Gordon asked about the cost of this project. The staff will provide this <br />information to the Board at a later time since this is only a public hearing. <br />Commissioner Jacobs made reference to the recommendations from the Construction <br />and Demolition Waste Recycling Task Force that involve the possibility of more structures: He <br />asked why these structures would be built that might not have enough room to include what would <br />be added in the future. Mike Meagher said that there would probably not be room on this tract for <br />C8~D waste. <br />Commissioner Halkiotis suggested scheduling a visit to the site. He also invited the <br />members of the Planning Board to visit .the site. <br />County Attorney Geoffrey Gledhill made same comments about moving ahead with this <br />process. (I couldn't hear him far some reason). Commissioner Halkiotis is not comfortable <br />moving ahead with this process without scheduling a visit to the landfill. <br />A motion was made by Commissioner Gordan, seconded by Commissioner Jacobs to <br />refer this modification to the Planning Board for a recommendation to be returned to the Board of <br />County'Cammissioners no sooner than November 1, 2000. <br />VOTE: 'UNANIMOUS <br />~. ORANGE COUNTY COMPREHENSIVE MAP AMENDMENT (Rural Industrial Nade) <br />Craig Benedict said that the rural industrial node was brought forward earlier this year. <br />He suggested that in the Comprehensive Plan process that staff look at the rural industrial nodes <br />and rural neighborhood nodes and indicate what uses are appropriate within the rural sections of <br />the County. Rural industrial nodes could have a hard or a soft use. The hard rural industrial node <br />would have more manufacturing and the soft rural industrial node would have less environmental <br />effect. The issue that came up an June 29'" had to do with the quarry and the rural industrial node. <br />He said that there were ways to control uses through zoning by having a Planned Development-1 <br />District where there can be specific uses. <br />Commissioner Gordon asked if staff could define the two industrial nodes as "hard <br />uses" and "soft uses". In response to inquiries from Commissioner Gordon, Craig Benedict said <br />that it would be important to not do very specific land use changes, but Countywide ar within the <br />watersheds. <br />A motion was made by Commissioner Brown, seconded by Commissioner Gordon to <br />refer the Orange County Comprehensive Map Amendment to the Planning Staff for incorporation <br />into the Comprehensive Planning Amendment Process. <br />VOTE: UNANIMOUS <br />5. SHAPING ORANGE COUNTY'S 1=UTURE REPORT - <br />Environment and Resource Conservation Director David Stencil gave this report. He <br />presented a PowerPoint presentation. The Shaping Orange County's Future task force included <br />30 citizens who met for three and a half years and developed some recommendations in April <br />2000. The task force was asked to develop quality growth strategy for the entire County, develop a <br />