Browse
Search
2018-347-E AMS - Hoffman and Hoffman HVAC Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-347-E AMS - Hoffman and Hoffman HVAC Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2018 10:40:27 AM
Creation date
8/7/2018 3:43:27 PM
Metadata
Fields
Template:
Contract
Date
7/31/2018
Contract Starting Date
7/31/2018
Contract Document Type
Agreement - Construction
Amount
$65,772.00
Document Relationships
R 2018-347 AMS - Hoffman and Hoffman HVAC BOE
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: AOD5DO06- 1BO4- 4F7B- 96D7- OF7A4E374317 <br />Remarks <br />1) As of today all items in stock in Houston, TX <br />Lead time is 5 -7 Days <br />2) 10 — Year Factory Warrenty on parts- NO Labor <br />10 —Year Factory Warrany on Compressor- NO Labor <br />No additional extended warranties available <br />3) Daikin requireds the installing Mechanical to be trained and certified <br />for installation of their VRV Product. If you are not already certified <br />you will be required to attend a (3) Day Installation training Class. <br />The cost of this Class is $ 428.00 per person. Classes ares held at our <br />Training Center located at our Greenboro NC facility. We will provide a <br />light breakfast and lunch. We do not include dinner, travel or hotel cost. <br />4) Daikin Branch Selector Boxes do not require condensate drains <br />5) We do not include any R410A refrigerant except for holding charge in Condensing units. <br />6) We do not include any Control Wiring or installation of controls <br />The control wiring is simple see attached piping and wiring <br />Drawings.The control wire type is 18/2 stranded and NON shielded type. <br />We do not include any interlock, control or power wiring <br />Notes: <br />• We do NOT include refrigerant lines, piping, condensate piping, T'stat boxes, electrical power wiring, roof <br />curbs, disconnect switches or condensing unit mounting pads. <br />• Daikin requires that the installing contractor to be "trained and certified" in the installation and <br />commissioning of Daikin VRV system. The VRV system has stringent layout and piping installation <br />requirements and requires comprehensive leak testing and evacuation prior to commissioning. The Daikin <br />training is "critical" to proper system installation and operation. Daikin has regularly scheduled classes at <br />the H&H Training Center in Greensboro, NC. It is strongly suggested that the Mechanical Contracor <br />send at least one of their key field installers to the Daikin Installation & Commissioning training class <br />prior to installation. Hoffman & Hoffman will provide the cost of this training for $ 428.00 per per <br />person.. However, contractor is resposible for all travel expenses. Training classes are held in <br />Greensboro, NC. <br />• The Daikin VRV System includes a one (10) year parts and compressor warranty from the date of <br />installation. Warranty is for defects in material and workmanship performed by the Daikin trained local <br />service contractor (i. e Installing Contractor). The Installing Contractor should include a provision for the <br />labor warranty with their bid. Parks will be repaired or replaced at the descretion of Daikin in accordance <br />to the Daikin Terms & Conditions. Daikin also has regularly scheduled "advanced" east coast training <br />classes available at the H &H Training Center in Greensboro, NC. <br />• We do NOT include extended compressor labor warranties. We include parts only. <br />• We DO include one (2) days of check - test - start -up assistance for the Daikin equipment for the installing <br />contractor with integral Owner Training during the start -up period. <br />• We do NOT include auxillary drain pans or float switches for the auxillary drain pans. <br />• We do NOT include conduit for all exposed and exterior areas or wire or installation of control wiring. <br />• We do NOT include any Commissioning Services. <br />3 Hoffman & Hoffman, Inc, • 2741 Noblin Rd, Suite 100 Raleigh, NC 27604 • 919 - 781 -8011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.