Browse
Search
Meeting 040496
OrangeCountyNC
>
BOCC Archives
>
Advisory Boards and Work Groups - Inactive
>
Stoney Creek Work Group
>
Meeting 040496
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 4:58:02 PM
Creation date
8/1/2018 11:38:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Basically, I have taken the various text files produced over the past year and begun the process of <br />editing and incorporating them into a single document. I'm trying to get as much done as <br />possible before our meeting and will mail a draft under separate cover on Monday along with <br />the March 14 minutes. <br />Item 5 - Continued Discussion on Implementation Issues <br />At our meeting on March 14, we discussed extensively five implementation issues carried <br />over from our February 28 meeting. I was unable to determine from meeting notes and my <br />interpretation of the minutes whether we had consensus on the following two items: <br />1. Expedited review and approval for some variation on five -acre lot development: <br />• either a conventional five -acre lot subdivision; or <br />• one wherein five-acre lots are the norm even though a yield plan indicates higher <br />density can be achieved and there is the possibility of transferring excess density <br />elsewhere; and <br />2. The possibility of a fixed -term conservation easement (20 years was discussed) that would <br />yield a density bonus, though much smaller than would be realized from preserving open <br />space in perpetuity. <br />While I dislike revisiting issues we have discussed, I think we need to be clear where we stand. <br />In that these issues have already been discussed at length, I hope we can readily identify areas <br />where we have consensus. <br />Item 6 - Presentation to Planning Board <br />Our schedule calls for a presentation to the Planning Board on April 15. This will not be <br />a final draft of the plan, but rather where things stand after our April 4 meeting. We are <br />scheduled to meet again on April 18 and there may be some comments from the Planning Board <br />that we can use in final adjustments to the plan. It would be good for as many Planning Group <br />members as possible to attend the Planning Board meeting to hear comments; the Board may <br />also have questions for the Planning Group. In that our meeting will take place three days after <br />the Planning Board, there will not be time to mail written comments so I will bring Planning <br />Board comments to our meeting. <br />Please remember, we have much to cover on April 4 and our time is <br />limited; we need to stay focused! <br />Call me at extension 2589 at 732 -8181 (Hillsborough), 967 -9251 (Chapel Hill), or 688- <br />7331 (Durham) if you have questions. If you would like to send a FAX, the number is 644 -3002. <br />
The URL can be used to link to this page
Your browser does not support the video tag.