Browse
Search
2018-327-E AMS - Summit Link waterproofing project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-327-E AMS - Summit Link waterproofing project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:40:33 PM
Creation date
7/31/2018 12:40:47 PM
Metadata
Fields
Template:
Contract
Date
7/17/2018
Contract Starting Date
7/17/2018
Contract Ending Date
9/30/2018
Contract Document Type
Agreement - Services
Amount
$10,000.00
Document Relationships
2019-028-E AMS - Summit Lower Level Exterior Waterproofing additional design services
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-327 AMS - Summit Link waterproofing project
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B6D50041- 4029- 45D2- A904- A005EF2DD654 <br />July 17, 2018 <br />Jeffery E. Thompson <br />Director - Asset Management Services <br />Orange County <br />131 W. Margret Lane <br />Hillsborough, NC 27278 <br />Reference: Proposal for the Design, Engineering Consulting, and Construction <br />Administration Services Y- To include design recommendations for shoring, underpinning <br />existing foundations and foundation waterproofing on the North and East foundations of the John <br />M Link, Jr. Government Services Center Building. As well as contractor solicitation and <br />negotiations. <br />SCOPE OF SERVICES <br />.4 <br />r� <br />r <br />P� <br />4 IT <br />ry <br />Geotechnical <br />Summit Geotechnical Engineers will evaluate the soil properties and conditions of the existing <br />excavation at the site and provide an engineering report addressing sloping and benching <br />recommendations. Additional services will include. earthwork recommendations for the backfill <br />operations, including grading and compaction requirements, shoring and bracing design <br />recommendations and recommendations for underpinning existing foundations. <br />Strructtrral, <br />Summit Structural Engineers will provide recommendations based on original plan data, to include <br />markup of existing details, and periodic site visits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.