Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />agreement of the parties. Other CMAR positions will be deemed included in the CMAR <br />Construction Fee. <br />3.9. Additional General Conditions costs alleged to arise from any Owner - requested change orders to <br />the Work of the Project will be reviewed on an individual change order basis. After consultation <br />with the Project Designer, the Owner shall determine whether the requested increases are caused by <br />an Owner- requested change order. Absent extraordinary circumstances, the CMAR should not <br />expect that any change order other than those requested by the Owner will allow for an increase in <br />its General Conditions. <br />3.10. The CMAR shall not, on account of differing site conditions, be entitled to any increase in the <br />CMAR Fee or General Conditions unless the differing site condition is such that the CMAR is <br />entitled to an extension of the time for completion of the Project of more than 30 calendar days. <br />4. CONSTRUCTION GUARANTEED MAXIMUM PRICE ( "GMP ") <br />4.1. Upon final review submission by the Project Designer of Construction Documents for an agreed <br />phase of the Work, the CMAR will develop and provide to the Owner a GMP for that phase which <br />will include all costs of construction, (hereinafter sometimes referred to as "Cost of the Work "), <br />and all other projected costs including without limitation the CMAR Fee, the CMAR -GMP <br />Contingency and General Conditions allowance, but not including the Owner's Construction <br />Contingency. The Early Completion Bonus Fund will not be included in any GMP until the final <br />GMP, at which time the Early Completion Bonus will be included in the GMP. The GMP shall set <br />out each anticipated Subcontract amount, the CMAR fixed Fee, the General Conditions Allowance <br />costs including on -site field staff, and all Project related costs, i.e., bonds, personnel payroll <br />benefits, etc. The allocation, basis and distribution of the cost of construction, CMAR Fee, General <br />Conditions and CMAR -GMP Contingency for each GMP shall be set out in detail in each GMP <br />amendment. <br />4.2. The GMP shall reflect all cash discounts obtained on payments made by the CMAR or any <br />Subcontractor, which shall be for the benefit of the Owner. Trade discounts, rebates, refunds, and <br />amounts received from sales of surplus or salvaged materials and equipment shall accrue to the <br />Owner and the CMAR shall make provisions so they can be secured and shall reduce the GMP <br />accordingly. Amounts which accrue to the Owner in accordance with this section shall be <br />accounted for and credited to the Owner as a deduction from the Cost of the Work or the General <br />Conditions as appropriate. <br />4.3. The CMAR will develop and submit its final GMP for the Project within 120 days of the Owner <br />approval of the final submission of the complete Construction Documents by the Project Designer. <br />At that time, the Total Construction Budget will be fixed, subject to changes only as set forth <br />herein by change order. Until that time, the CMAR agrees to use its best efforts to work with the <br />Project Team to keep the cost of the Project within the Total Construction Budget. <br />4.4. Each GMP for a phase of the Work shall identify the Construction Drawings that define the scope <br />of work covered by the GMP, shall describe any assumptions or clarifications concerning the scope <br />of the Work, shall describe any special allowances and the basis on which each allowance was <br />calculated, and shall contain the progress schedule related to that phase of the Work. <br />4.5. The Owner reserves the right to direct the CMAR to (and the CMAR shall) work in conjunction <br />with the Project Designer to redesign the Project as necessary to maintain the Project program and <br />meet the Total Construction Budget as follows: <br />4.5.1. After consultation with the Owner, the CMAR shall coordinate and cooperate with the <br />Project Team to alter and redraft Construction Documents as necessary to accomplish the <br />required reduction in cost. <br />Page 7 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.