Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />This Fee shall also include all home office quality control and safety reviews, as well as all <br />required services of a home office Project executive, by whatever name called. CMAR costs which <br />are not to be included in the CMAR Fee are the costs of all Subcontracts, on -site field staff, <br />General Conditions costs (as provided below), and the CMAR -GMP Contingency described below. <br />3.3. When a GMP is established and approved for a defined phase of the Work, the CMAR Fee for that <br />GMP shall be converted to a lump sum and be included in the GMP. When the final GMP is <br />established and approved, the CMAR agrees that the cumulative CMAR Fee shall not exceed the <br />maximum amount set forth above in paragraph 3.2, and shall not cause the final GMP to exceed the <br />Total Construction Budget approved by the Owner. Thereafter, the CMAR Fee shall not be <br />adjusted unless cumulative Owner requested Change Orders to the Work of the Project adjust the <br />total Cost of the Work in the total cumulative GMP in excess of FIVE (5.0 %) percent. The entire <br />CMAR Fee at the time the final GMP is fixed, including all lump sum CMAR fees for each GMP <br />for a defined phase of Work, shall not exceed the amount in 3.2 above. In the event an adjustment <br />to the Fee is warranted under this paragraph, a lump sum adjustment to the Fee shall be equitably <br />determined based on the nature of the changes to the Work, proven changes in the scope of services <br />provided by the CMAR, and any other factor that would affect the effort and cost expended by the <br />CMAR due to changes to the Work. <br />3.4. In addition to the foregoing Fee, an allowance for the General Conditions on a "not -to- exceed" <br />basis will be submitted by the CMAR with each GMP for the Owner's approval. No costs <br />associated with the CMAR's main office or its main office or other off -site personnel, including the <br />costs associated with the use of items or equipment of the main office, are covered under the <br />General Conditions allowance. All such costs are deemed to have been included in the CMAR Fee. <br />Subject to approval by the Owner's Representative, each GMP may include special designated <br />allowances for defined expenses. Each GMP shall contain an allowance for General Conditions <br />fixed as an estimated lump sum for each GMP. The entire General Conditions allowance shall be <br />fixed based on the Total Construction Budget at the time of the final GMP, after which the General <br />Conditions shall not be adjusted unless an amount is negotiated with Owner- requested Change <br />Orders to the Work of the Project. The sum of the entire General Conditions at the time the final <br />GMP is fixed, including all allowances for General Conditions for each GMP for a defined phase <br />of Work, shall not exceed $1,184,693, subject to approval by the Owner and modification and <br />limitation as further set forth herein. Owner reserves the right to inspect and /or audit all General <br />Conditions services cost documentation. <br />3.5. General Conditions shall be broken down into a reasonable number of categories as approved by <br />the Owner's Representative and as detailed in Appendix A, Division of Cost Elements. The <br />General Conditions items to be handled by the CMAR on a not -to- exceed allowance basis are to <br />include, but not necessarily be limited to the following items: <br />3.5.1. Mobilization: Move on site and establish appropriate field offices. <br />3.5.2. Travel Expenses: All travel, by any conveyance, relating to the Project; except that, with <br />the prior approval of the Owner's Representative, travel required for product reviews, <br />selection, inspection, approvals and expediting at the place of production of such <br />products, shall be chargeable at cost to the cost of the Work under the GMP. <br />3.5.3. Temporary Facilities: Owner will assist CMAR in providing field office(s). Owner will <br />assist CMAR with providing other appropriate office necessities such as temporary <br />electric, heating, water, and sanitation, after consultation with the Owner's <br />Representative. These costs should be incurred judiciously. Owner will also assist CMAR <br />in establishing and maintaining an appropriate shipping and receiving system. <br />3.5.4. Plans /Surveys/Permits/Testing: Reproduction of Construction Documents as needed by <br />the CMAR over and above the allowance for Construction Documents provided by the <br />Owner. Provide surveyor's services (site layout, etc.), as required. Acquire all required <br />permits (fee for permits to be paid directly by Owner unless otherwise directed by the <br />Owner's Representative). Perform inspections of the existing buildings and Project <br />Page 5 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.