Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />and the costs of general liability insurance when premiums are computed based on payroll <br />amounts; the total of which shall not exceed forty percent (40 %) of the actual costs of labor; <br />32.13.4. The actual costs of rental for tools, excluding hand tools; equipment; machinery; and <br />temporary facilities required for the Project; <br />32.13.5. The actual costs of premiums for bonds, insurance, permit fees, and sales or use taxes <br />related to the Project; <br />32.13.6. Overtime and extra pay for holidays and weekends may be a cost item only to the extent <br />approved by the Owner; <br />32.14. The amount for Overhead and profit combined the CMAR shall allow on subcontractors shall be <br />based on the following schedule: <br />32.14.1. For the Contractor (1st tier), for Work performed by the Contractor's own forces, Fifteen <br />percent (15 %) of the cost; <br />32.14.2. For the Contractor, for Work performed by the Contractor's Subcontractors (2nd tier, 3rd <br />tier, etc.), Five percent (5 %) of the amount due the (2nd tier, 3rd tier, etc.) Subcontractors; <br />32.14.3 For each Subcontractor (2nd tier, 3rd tier, etc.) involved, for Work performed by that <br />Subcontractor's own forces, Fifteen percent (15 %) of the cost; <br />32.14.4 For a deductive Change order for Work performed by the Contractor's own forces, Five <br />Percent (5 %) of the cost; <br />32.14.5 For a deductive Change order for Work performed by the subcontractor's (2nd tier, 3rd <br />tier, etc.), Five Percent (5 %) of the amount due the subcontractor; <br />32.15. If any of the items included in the lump sum proposal are covered by unit prices, the Owner may, if <br />it requires the change in the Work to be performed on a lump sum basis, elect to use these unit <br />prices in lieu of the similar items included in the lump sum proposal, in which event an appropriate <br />deduction will be made in the lump sum amount prior to the application of any allowed overhead <br />and profit percentages. No additional Subcontractor overhead and profit shall be applied to any unit <br />prices. <br />32.16. In the event that the CMAR fails to submit its proposal or obtain approval of an extension of time <br />within the designated period, the Owner may order the CMAR to proceed with the change or <br />addition to the Work and the CMAR shall so proceed. The Owner shall unilaterally determine the <br />reasonable cost and time to perform the Work in question, which determination shall be final and <br />binding upon the CMAR. <br />32.17. The Owner reserves the right to reject the CMAR's proposal for a change in the Work and to elect <br />to perform said Work using a separate Subcontractor. Under such circumstances, the CMAR shall <br />coordinate the performance of the Work. <br />32.18. If the Owner requests a change order and the CMAR's terms are unacceptable, the Owner may <br />require the CMAR to perform such Work on a time and material basis. If the Owner elects to have <br />the change in the Work performed on a time and material basis, the CMAR shall submit to the <br />Owner daily time and material tickets, to include the identification number assigned to the change <br />in the Work, the location and description of the change in the Work, the classification of labor <br />employed (and names and social security numbers), the materials used, the equipment rented (not <br />tools) and such other evidence of cost as the Owner may require. The Owner may require <br />authentication of all time and material tickets and invoices by persons designated by the Owner for <br />Page 35 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.