Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />31.2. The CMAR shall incorporate into each element of the system of Project cost control all Owner <br />approved changes as they occur, update and refine the GMP, and develop reports and forecasts as <br />needed, or as directed by the Owner. The CMAR shall identify variances between actual and <br />estimated costs and advise the Owner whenever projected cost exceeds allowances or estimates. <br />31.3. The CMAR shall check and supervise all material deliveries, equipment and labor entering the <br />Work site. The CMAR shall maintain cost accounting records on authorized Work performed under <br />unit costs, actual costs for labor and material, or other bases requiring accounting records, and <br />afford the Owner access to these records and preserve them for a period of three (3) years after <br />final payment. The Owner reserves the right to audit these records during that period. <br />32. CHANGES IN THE WORK <br />32.1. The CMAR shall develop and implement a system for review, negotiation, and processing of <br />proposed Change Orders. The CMAR shall, with complete supporting data, recommend necessary <br />desirable changes to the Owner and the Project Designer for approval. <br />32.2. The Owner unilaterally at any time may have changes made in the Work covered by the Contract, <br />including but not limited to changes: (1) in the specifications or drawings; (2) in the sequence, <br />method or manner of performance of the Work; (3) in the Owner - furnished facilities, equipment, <br />materials, services or site; or (4) directing acceleration in the performance of the Work. <br />Furthermore, it is understood and agreed that refinement and detailing may be accomplished from <br />time to time with respect to the drawings and specifications. The CMAR's entitlement to an <br />increase in the GMP or an extension of time, or both, if any, for such changes shall be determined <br />in accordance with this Contract. <br />32.3. No adjustment in the Guaranteed Maximum Price or the Scheduled Completion Date shall be made <br />unless such change, refinement or detailing results in changes in the scope and/or design of the <br />Project, as determined by the Owner. <br />32.4. The Owner's Representative has the authority to order minor changes in the Work not involving an <br />adjustment in the GMP or time for completion, and not inconsistent with the intent of the <br />Construction Documents. Such changes shall be effected by written order and shall be binding on <br />the Owner and the CMAR. The CMAR shall not perform any changes in the Work unless <br />authorized in writing by the Owner. The CMAR's performance of minor changes pursuant to this <br />section shall not constitute a waiver of any claim the CMAR may have for additional compensation <br />or time. Any claim the CMAR may have, however, shall be filed in strict conformance with this <br />Contract. <br />32.5. No Change Order will be issued for resolution of conflicts in the documents which are to be <br />covered by the CMAR -GMP Contingency. <br />32.6. Except in an emergency endangering life or property, no change shall be made by the CMAR <br />except upon receipt of approved change order or written field order from the Project Designer, <br />countersigned by the Owner's representative authorizing such change. No claim for increases in the <br />GMP shall be honored or valid unless this procedure is followed. A field order, transmitted by fax <br />or hand - delivered, may be used where the change involved impacts the critical path of the Work. A <br />formal change order shall be issued within the time stated on the field order. <br />32.7. The CMAR shall notify the Owner in writing (and copy to Project Designer) if the CMAR believes <br />that a change in scope or design will require a change in the GMP. The Owner shall have the right <br />to require the performance thereof on a lump sum basis, a unit price not to exceed basis, or a time <br />and material not to exceed basis. <br />Page 33 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.