Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />the Work is greater than thirty (30) days behind schedule and no legitimate requests for time <br />extensions are in process, then the CMAR shall prepare and submit to the Project Designer a <br />recovery schedule for review and approval. Failure of the CMAR to abide by the directives in this <br />paragraph will give the Owner cause to terminate the Contract and pursue any other legal remedies <br />allowed it by law. <br />SHOP DRAWINGS, SUBMITTALS, SAMPLES, DATA <br />25.19. The CMAR shall develop and implement a system for review, acceptance or rejection, and <br />processing of all shop drawings and submittals, including the projected lead -time on the CPM <br />schedule. The CMAR shall review this system with the Owner and the Project Designer, and obtain <br />the Owner's approval prior to implementation. <br />25.20. Within 30 consecutive calendar days of the notice to proceed with each GMP, a schedule for <br />anticipated submission of all shop drawings, product data, samples, and similar submittals shall be <br />prepared by the CMAR and provided to the Project Designer. This schedule shall indicate the <br />items, relevant specification sections, other related submittal data, and the date when these items <br />will be furnished to the Project Designer. <br />25.21. The CMAR will be responsible for logging all shop drawings /submittals and stamping them <br />reviewed and approved prior to submission to the Project Designer. The CMAR shall provide <br />additional copies of any submittals or shop drawings requested by the Owner. The CMAR is to <br />insure that shop drawing /submittal packages are submitted in an appropriate manner and, if not, <br />return them to the Subcontractor for proper submission. <br />25.22. The CMAR shall be responsible for tracking and monitoring all shop drawings /submittals <br />throughout construction until all shop drawings /submittals have been approved by the Project <br />Designer and completion reported to the Owner. <br />25.23. The CMAR shall include shop drawings as an agenda item on all Owner meetings and advise the <br />Owner immediately of any delays in the shop drawing and submittal process. <br />25.24. The CMAR shall develop a shop drawing and submittal aging report which is to be submitted to <br />the Owner at each weekly progress meeting. <br />25.25. Approval of shop drawings by the Project Designer shall not be construed as relieving the CMAR <br />from responsibility for compliance with the design or terms of the Contract Documents nor from <br />responsibility of errors of any sort in the shop drawings, unless such error has been called to the <br />attention of the Project Designer in separate writing by the CMAR. <br />26. SUBSTITUTION REQUESTS <br />26.1. The CMAR will be responsible for logging all substitution requests. The CMAR will be <br />responsible for reviewing all substitution requests to insure that they are complete; and, if not, <br />return them to the Subcontractor for proper submission. The CMAR will be responsible to review <br />all substitution requests prior to submission to the Project Designer and the Owner. It is to be noted <br />that the Owner discourages substitutions and the Owner's approval will be granted only upon the <br />most persuasive arguments as to quality, function and financial merit regarding a substitution. The <br />CMAR shall be responsible for tracking and monitoring all substitution requests throughout <br />construction until all substitution requests are processed by the Project Designer and the Owner. <br />The CMAR shall be responsible to see that all substitution requests are submitted in a timely <br />manner per the specifications. The CMAR shall include substitution requests, if any, on the agenda <br />topic at the Owner's meetings and advise the Owner immediately of any delays in the substitution <br />request process. <br />27. REQUESTS FOR INFORMATION <br />Page 29 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.