DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />clarifications will be required. The schedule will be subject to addition or change in accordance <br />with progress of the Work. The Project Designer shall furnish drawings or clarifications in <br />accordance with that schedule. The CMAR shall not proceed with the Work without such detail <br />drawings and/or written clarifications. <br />25.8. The arrow network diagram will be drawn in a level of detail suitable for display of salient features <br />of the Work, including but not limited to the placing of orders for materials, submission of shop <br />drawings for approval, approval of shop drawings by the Project Designer and the Owner, delivery <br />of material, and all Work activities inclusive of punch list agreed to by the Owner. Each Work <br />activity shall be assigned a time estimate by the CMAR. One -day shall be the smallest time unit <br />used. Data shall also be provided in Gantt form. This schedule will not be the basis for invoicing, <br />but may be considered by the Design Professional and the Owner when evaluating the percentage <br />of Work represented to be complete in each schedule of values. <br />25.9. Upon completion of the network diagrams, the CMAR shall have computer input data prepared, <br />and a computer run made to generate a printout for the Project based on the information supplied. <br />In the event the completion date indicated by the schedule exceeds the contractual date, the logic <br />and time estimates used to develop the plan will be reviewed, changes made in the logic and time <br />estimates, and another computer run made to generate a new schedule. This procedure shall be <br />repeated, if necessary, to provide a plan and schedule to meet Owner requirements. All submissions <br />shall be both in hard copy and in electronic format. <br />25.10. Within fifteen (15) days of each GMP notice to proceed, the updated CPM schedule shall be <br />submitted to the Owner for review and approval. No application for payment will be processed <br />until the Project CPM schedule is approved by the Owner. This working plan shall show job <br />identification, job duration, manpower loading, cost loading, calendar dates for start and finish of <br />each job, and jobs critical to the completion of the Project on schedule. When approved by the <br />Owner, they shall become the working plan and schedule for the Project and such information shall <br />be provided to the Contractor for distribution to the Project Team. The CMAR shall distribute to <br />the Subcontractors the approved Project CPM schedule and shall display same at the job site. <br />25.11. The CMAR shall review the plan and schedule each week. An updated Project schedule shall be <br />furnished showing actual completed Work at the end of each month in respect to the entire Project. <br />The form used shall be approved by the Owner and shall be submitted with the monthly invoice. <br />The CMAR shall also develop and submit a Work plan for a two week, thirty day and sixty day <br />look ahead. <br />25.12. The CMAR shall provide regular monitoring of the schedule as construction progresses, identify <br />potential variances between scheduled and desired completion dates, review the schedule for Work <br />not started or incomplete, review the status of submittals and delivery of long -lead time deliveries, <br />review the Owner's occupancy priorities, and take the action necessary to meet the required <br />completion date. The CMAR shall furnish to the Owner various schedules and updates setting forth <br />planned and completed progress of the Project broken down by the various divisions or parts of the <br />Work and by calendar days. The CMAR shall ensure that all schedules are prepared and updated in <br />strict conformance with the Owner's requirements for formatting of reports for the Owner. The <br />CMAR shall keep the Owner, the Project Designer and all Subcontractors fully informed as to all <br />changes and updates to the schedule. The CMAR shall ensure that all schedules are prepared and <br />updated in strict conformance with the Owner's requirements and for provision of one inclusive <br />schedule incorporating necessary lead times for actions required, by the Owner and regulatory <br />agencies (including Orange County), by the Consultant, by the CMAR, and by utility companies <br />providing services or relocating service lines and facilities, by all Subcontractors, and for <br />significant General Condition's activities, including but not limited to agenda submittals, permit <br />and approvals applications and review of interim and final plans, specifications and bid packages. <br />Page 27 of 53 <br />Revised 10/17 <br />