Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />20.3. Before final inspection and acceptance of the building, the CMAR shall ensure that all portions of <br />the Work are clean, including glass, hardware, fixtures, masonry, tile and marble (using no acid). <br />The CMAR shall clean and wax all floors as specified, and completely prepare the building for use <br />by the Owner, with no cleaning required by the Owner. <br />21. PROTECTION OF WORK, PROPERTY AND THE PUBLIC <br />21.1. The CMAR shall be responsible for the entire site and the building or construction of the same and <br />provide all the necessary protections, as required by the Owner's Representative or Project <br />Designer, and by laws or ordinances governing such conditions. Consistent with the <br />indemnification provisions elsewhere in this Contract, and subject to the benefits of any Owner- <br />controlled or Owner - provided insurance that covers the interests of the CMAR and its <br />Subcontractors, the CMAR shall be responsible for protecting the public and those on the site <br />against all bodily injury or harm, and protecting against any damage to the Work, to adjacent <br />property, and to property of others. The CMAR shall have access to the Project at all times. Subject <br />to its ultimate contractual responsibility for protection of work, property and the public under this <br />Contract, and subject to any non - delegable duties imposed by law, the CMAR may delegate to <br />Subcontractors these obligations of the CMAR under this Contract, and may obtain indemnification <br />and insurance from Subcontractors as the CMAR deems reasonable and prudent. <br />21.2. The CMAR shall provide cover and protect all portions of the structure when the Work is not in <br />progress, provide and set all temporary roofs, covers for doorways, sash and windows, and all other <br />materials necessary to protect all the Work on the building, whether set by it, or any of the <br />Subcontractors. <br />21.3. Any Work damaged through the lack of proper protection or from any other cause, shall be repaired <br />or replaced without extra cost to the Owner. <br />21.4. No fires of any kind will be allowed inside or around the operations during the course of <br />construction without special permission from the Owner's Representative. <br />21.5. The CMAR shall protect all trees and shrubs designated to remain in the vicinity of the operations <br />by building substantial boxes around same. The CMAR shall barricade all walks, roads, etc., as <br />directed by the Project Designer to keep the public away from the construction. All trenches, <br />excavations or other hazards in the vicinity of the Work shall be well barricaded and properly <br />lighted at night. <br />21.6. The CMAR shall develop and implement a Project safety program in accordance with the RFQ and <br />applicable regulations. The Owner will have final approval of the CMAR's Safety Program. The <br />Owner's Representative may require additional safety measures before granting approval. <br />Subcontractors must also comply with any such additional safety requirements of the OCIP <br />program. The CMAR shall report, to the Owner, as part of each monthly report, any safety <br />violations and actions taken to protect the safety of persons and property engaged in the Project. <br />The CMAR may require that all Subcontractors meet the CMAR's safety program requirements <br />including where those requirements meet or exceed State or Federal requirements. <br />21.7. The CMAR shall be responsible for all necessary safety measures for the protection of all persons <br />on the job, including the requirements of the Associated General Contractors of America <br />Accident Prevention Manual in Construction, as amended, and shall fully comply with all state, <br />federal, and local laws or regulations and North Carolina State Building Code requirements to <br />prevent accident or injury to persons on or about the location of the Work. The CMAR shall clearly <br />mark or post signs warning of hazards existing, and shall barricade excavations, elevator shafts, <br />stairwells and similar hazards. The CMAR shall protect against damage or injury resulting from <br />falling materials and shall maintain all protective devices and signs throughout the progress of the <br />Work. <br />Page 21 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.