Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />19.8.2. Temporary closures or filters shall be installed in each of the heating and air conditioning <br />units and at each return grille during construction. New filters shall be installed in each <br />unit prior to the Owner's acceptance of the Work. <br />19.8.3. Extra effort shall be maintained to keep the building and the site adjacent to the building <br />clean. Under no circumstances shall air systems be operated if finishing and site Work <br />operations are creating dust in excess of what would be considered normal if the building <br />were occupied. <br />19.8.4. It shall be understood that any warranty on equipment presented to the Owner shall <br />extend from substantial completion and occupancy by the Owner. The cost of <br />maintaining the equipment during operation in the finishing stages of construction shall <br />be borne by the Subcontractor whose system is utilized. <br />19.8.5. The CMAR shall ensure that all lamps are in proper working condition at the time of final <br />Project acceptance. <br />19.9. The CMAR shall provide, if required and where directed, toilet facilities and shall furnish <br />and install all water closets required for a complete and adequate sanitary arrangement. <br />These facilities will be available to other Subcontractors on the job and shall be kept in a <br />neat and sanitary condition at all times. Chemical toilets are acceptable. <br />19.10. The CMAR shall, if needed and where directed by the Owner's Representative, erect a <br />temporary field office, complete with lights, telephone, heat and air conditioning. A <br />portion of this office shall be partitioned off, of sufficient size, for the use of the Project <br />Designer, should the Owner's Representative so direct. <br />19.11. The CMAR is responsible for making temporary elevators, lifts, or other special <br />equipment available for the general use of all Subcontractors. The cost for such elevators, <br />lifts or other special equipment and the safe and efficient operation thereof may be <br />included in the CMAR's General Conditions. <br />19.12. The CMAR will erect one sign on the Project, and may erect others if approved by the <br />Owner's Representative. The sign(s) shall be of sound construction, and shall be neatly <br />lettered. The sign(s) shall bear the name or logos approved by the Owner's <br />Representative of participants on the Project, and the CMAR's name, and the name of the <br />Project Designer and consultants. Directional signs may be erected on the Owner's <br />property subject to approval of the Owner with respect to size, style and location of such <br />directional signs. Such signs may bear the name of the CMAR and a directional symbol. <br />All signs must comply with all local sign, appearance, and traffic ordinances. No other <br />signs will be permitted except by permission of the Owner's Representative. <br />20. CLEANING UP <br />20.1. The CMAR shall ensure that the building and surrounding area is reasonably free from rubbish at <br />all times, and shall remove debris from the site on a timely basis or when directed to do so by the <br />Owner's Representative. The CMAR shall provide an on -site refuse container(s) for the use of all <br />Subcontractors. The CMAR shall ensure that each Subcontractor removes their rubbish and debris <br />from the building on a daily basis. The CMAR shall ensure that the building is broom cleaned as <br />required to minimize dust and dirt accumulation. <br />20.2. The CMAR shall provide and maintain suitable all- weather access to the construction site and all <br />buildings. <br />Page 20 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.