Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />hardware are installed; and other openings have protection, which will provide reasonable climatic <br />control. The appropriate time to start the mechanical systems and climatic condition shall be jointly <br />determined by the CMAR and the Project Designer. Use of the equipment in this manner shall in <br />no way affect the warranty requirements of the CMAR. <br />19.6. The CMAR shall coordinate the Work so that the building's permanent power wiring distribution <br />system shall be in sufficient readiness to provide power as required by the HVAC Subcontractor <br />for temporary climatic control. <br />19.7. The CMAR shall coordinate the Work so that the building's permanent lighting system shall be <br />ready at the time the Subcontractors begin final interior painting and other final interior finishes <br />and shall provide adequate lighting in those areas where other interior painting and finishing is <br />being performed. <br />19.8. The CMAR shall be responsible for its permanently fixed service facilities and systems in use <br />during progress of the Work. The following procedures shall be strictly adhered to: <br />19.8.1. Prior to acceptance of Work by the Owner, the CMAR shall coordinate the removal and <br />replacement of any parts of the permanent building systems damaged through use during <br />construction. <br />Page 19 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.