Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />Owner's property. The identification badges shall at a minimum display the company name, <br />telephone number, employee name and a picture of the employee. The CMAR and its <br />Subcontractors shall comply with the Owner's access procedures when working on any existing <br />facility. Owner and its representatives reserve the right to require the CMAR to immediately <br />remove any such person(s) failing to comply with this requirement until such time as proper <br />identification requirements are complied with. <br />18. CUTTING, PATCHING AND DIGGING <br />18.1. The CMAR shall ensure satisfactory performance of all cutting, fitting, or patching that may be <br />required to make the Work come together properly and fit to receive or be received by Work of <br />other Subcontractors shown upon or reasonably implied by the drawings and specifications for the <br />completed structure, as the Project Designer may direct. <br />18.2. Any cost brought about by defective or ill -timed Work shall be borne by the party responsible <br />therefore. <br />18.3. No Subcontractor shall endanger any Work of another such Subcontractor by cutting, digging, or <br />other means, nor shall any Subcontractor cut or alter the Work of any other such Subcontractor <br />without the consent of the Project Designer and the affected Subcontractor(s). <br />19. UTILITIES, STRUCTURES, SIGNS <br />19.1. Prior to the operation of permanent systems, the CMAR will cooperate with the Owner to arrange <br />for temporary power, lighting, water, and heat to maintain space temperature above freezing, as <br />required for construction operations. Utility charges for temporary power, lighting, water, and heat <br />will be paid directly by the Owner, unless the Owner directs the CMAR to pay such charges as a <br />General Conditions expense. <br />19.2. The CMAR shall provide or arrange for as appropriate necessary and adequate apparatus and <br />facilities for water, electricity, gas, fuel, oil, sewer, and other utility services, which may be <br />required for completion of the Project. It is anticipated that the Owner will pay directly to the each <br />utility company all public utility charges for metered utilities such as water, sewer and power. <br />Nevertheless, if requested by the Owner, any permanent meters installed shall be listed in the <br />CMAR's name until its Work is deemed substantially complete and occupied by the Owner, and <br />the Owner may hold the CMAR responsible for extended utility charges in the event completion of <br />the Project is delayed. The Owner or CMAR, as applicable, shall cooperate with one another to <br />recover actual costs of metered utilities from the responsible party should delays occur in Project <br />completion. Extended metered utility costs are in addition to the liquidated damages provided for <br />elsewhere in this Contract. <br />19.3. Any meters listed in the name of the CMAR shall be re- listed in the Owner's name on the day <br />following completion and acceptance of the CMAR's Work, and the Owner shall pay for services <br />used after that date. <br />19.4. The Owner shall be reimbursed for all metered utility charges after the meter is re- listed in the <br />Owner's name and prior to completion and acceptance of the Work of all Subcontractors. <br />Reimbursement shall be made by the Subcontractor that's Work has not been completed and <br />accepted. <br />19.5. The CMAR shall have the permanent building systems in sufficient readiness for furnishing <br />temporary climatic control at the time a building is enclosed and secured. The HVAC systems shall <br />maintain climatic control throughout the enclosed portion of the building sufficient to allow <br />completion of the interior finishes of the building. A building shall be considered enclosed and <br />secured when windows, doorways (exterior, mechanical, and electrical equipment rooms), and <br />Page 18 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.