Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />Orange County Detention Facility, Environment & Agriculture Center & Park Operations Base <br />Request for Qualifications (RFQ #5249) <br />•: r <br />QUESTIONNAIRE <br />12. Describe your team's commitment to the success of this project and why you believe your assembled team is the best <br />choice for this project. <br />First and foremost, the Bordeaux Team proposed for the project are Jail experts. We will utilize this knowledge to <br />ultimately save Orange County money. The Bordeaux Team is uniquely and best qualified for the Orange County <br />project for the following reasons: <br />Local participation: We understand that this is a large municipal project for Orange County. We are local <br />to the project and are committed to ensuring that contracts are awarded with the goal of maximizing local <br />Orange County participation. <br />Local superintendent: Project Superintendent, Kevin Sowter, lives in Wake Forest and has greatjail <br />construction experience including Orange County Justice Center. Kevin understands the importance of the <br />success of the project means to the Orange County. This project will be personal. <br />Jail Experience: Jail Construction is a very unique niche of construction and frankly, we are good at it. We <br />have built over 25 Jails over the past 20 years. Bordeaux Construction was the Construction Manager on <br />Bladen County Detention with Moseley Architects, which is an extremely similar sized facility to the proposed <br />Orange County Detention Center. Project Manager, Blair Bordeaux, will be able to use actual bid results, <br />bid manual documents, project schedule, and most importantly "lessons learned "to avoid mistakes. Our <br />experience at Bladen Detention will save Orange County money. <br />Experience with Moseley Architects: We have completed (5) Detention and Law Enforcement Center <br />projects with Moseley Architects. In addition, we were brought on to complete the Stanly County Detention <br />Center project with Moseley Architects when that contractor faltered. Bordeaux Construction recently <br />completed the $21 M Brooks Elementary for Wake County Schools (CMAR) and the $20M Bladen County <br />Detention project (CMAR) with Moseley Architects. We have a great working relationship with Moseley and <br />would step in ready to go on day one. <br />13. Describe your value engineering process. <br />We like to use the term Value Analysis over Value Engineering. Value Engineering is cutting cost after the design <br />is complete. Our Value Analysis process ensures that costs are tracked through the design process and into the <br />development of a Guaranteed Maximum Price (GMP). Further detail of this process is provided in the Value Analysis <br />section of our Project Approach. The Value Analysis Section in the Project Approach of our proposal provides further <br />detail. <br />14. Describe how responsibilities as a CM at Risk differ from responsibilities as a General Contractor. <br />The primary difference between responsibilities as a Construction Manager at Risk and a General Contractor is that as <br />a Construction Manager, Bordeaux Construction will serve as an extension of the Orange County Staff. We understand <br />our responsibility as fiduciary to Orange County and all bid processes are open book. <br />In addition to being an extension of Orange County staff, the Bordeaux Construction Team will provide added value <br />over a general contractor by providing a better guarantee of quality. The general contractor experiences a potential <br />conflict of interest by bending the rules on quality to increase profit. As your Construction Manager, Bordeaux <br />Construction will advocate that the quality control expectations are defined up front, and contract requirements are <br />met. <br />Schedule will be defined during the preconstruction phase of the project and incorporated into bid packages. As <br />your Construction Manager, Bordeaux Construction will work with Orange County to develop the schedule in the <br />preconstruction phase of the project and ensure that permitting, design, and construction milestones are met. <br />Local and minority participation will be maximized. The GC looks only at cost. As your Construction Manager, <br />ON <br />
The URL can be used to link to this page
Your browser does not support the video tag.