Orange County NC Website
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />Orange County Detention Facility, Environment & Agriculture Center & Park Operations Base <br />Request for Qualifications (RFQ #5249) <br />•: r <br />QUESTIONNAIRE <br />5. Explain the firm's procedures for document quality control and coordination of the various trades in the review of design <br />documents and specifications. Also, explain the some coordination of trades in the GMP Development and Construction <br />Phase. <br />Bordeaux Construction will utilize Procore, a centralized on -line communication portal. Procore allows instant access <br />to the most current project data to all project team members including architect, engineer, client, and subcontractor. <br />A full list of our procedures and deliverables are included in the Preconstruction Phase Services section of the <br />proposal. Please refer to the "Document Tracking & Reporting" section in the Project Approach for more details. A few <br />highlights of these include: <br />Value Analysis: Provide information for the project team to make informed decisions of the Best Value for <br />Performance, cost (both Initial Cost and Life Cycle Cost), quality, maintenance, and schedule. Value Analysis <br />recommendations are tracked through the development of the design documents through our Value Analysis <br />Log <br />Interdisciplinary Constructability Review: Incorporate input from the Project Manager, Project <br />Superintendent, Mechanical /Electrical /Plumbing (MEP) estimator, Virtual Construction Manager, and Building <br />Information Modeling (BIM) reviews to provide a comprehensive constructability review beginning in the <br />design phase and through GMP development. Each item developed during the constructability review <br />process is tracked in a Constructability Review Log. <br />Request for Information (RFI) and Shop Drawings: All project documents are kept in our secure server in <br />Procore. Access privileges are user specific and information can be filtered to an executive summary level <br />down to the detail of which documents are outstanding. <br />"Live Set" Drawings: By utilizing Procore for hosting all project documents we maintain a set of contract <br />documents with up to date modifications, clarifications, and revisions that all stakeholders in the project <br />can use. This eliminates the waste and inefficiency from trades not working from the most current set of <br />documents. Effectively, this allows all trades to work from the as -built set. <br />6. Describe procedures you use to review and consider product substitutions. <br />During preconstruction, various product substitutions are considered as part of our Value Analysis process. During this <br />process, we investigate and suggest viable design and product substitutions. We look not only at initial cost, but life <br />cycle cost, quality, maintenance, and schedule. <br />During the bidding stage, we develop procedures for suppliers, vendors, and subcontractors to submit substitution <br />requests. These procedures have specific requirements including a point by point comparison with the specification <br />to ensure that quality is maintained and a specific cutoff date that ensures the designer will have adequate time to <br />review and assess the substitution request. <br />During construction, substitution requests are only allowed in unique instances such as where a significant cost or <br />savings may be available to the client. They are not allowed for convenience. <br />7. Describe how the team would provide cost management services on this project using the CM at Risk delivery method. <br />How would you reconcile differences between your cost estimates and those prepared by the Design Team? Provide the cost <br />model format used on one of your four similar completed projects listed in your response. <br />Our cost management services are detailed in the Cost Estimating and Budget Management of our Project Approach. <br />We utilize onscreen takeoff so that team members can visually see quantity take off. We prepare an estimate <br />presentation at project milestones which include Schematic (SD), Design Development (DD), and Construction <br />Drawings (CD). Our budget reconciliation process is detailed in the Budget Reconciliation section of our proposal and <br />usually involves a meeting with the owner, architect, and potentially outside consultants and cost estimators to review <br />items within the trend log and estimate presentation. <br />011 <br />