Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />13. SEPARATE CONTRACTS <br />13.1. Without invalidating the relationships with the CMAR, the Owner reserves the right to let other <br />contracts in connection with the Project, the Work under which shall proceed simultaneously with <br />the execution of the CMAR's Work. Separate contracts may include materials or equipment that <br />the Owner elects to provide itself. The Owner may also enter into separate contracts with testing <br />firms or other technical support firms to assist the Owner in connection with the Project. The <br />CMAR shall afford other separate Subcontractors reasonable opportunity for the execution of their <br />Work and for the introduction and storage of their materials, and the CMAR shall take all <br />reasonable action to coordinate its Work with theirs. If the Work performed by the separate <br />Subcontractor is defective or so performed as to prevent the CMAR from carrying out its Work <br />according to the plans and specifications, the CMAR shall immediately notify the Project Designer <br />and the Owner upon discovering such conditions. <br />14. WARRANTY AND GUARANTEE <br />14.1. The CMAR unconditionally warrants and guarantees all materials and workmanship against patent <br />defects arising from faulty materials, faulty workmanship or negligence for a period of twelve (12) <br />months following the date of substantial completion of the Work and beneficial occupancy and <br />shall replace such defective materials or workmanship without cost to the Owner. Project <br />specifications shall require extended warranty provisions when requested by Owner. <br />14.2. In addition to the foregoing general warranty, the Owner may require extended warranties for <br />specified building components, including without limitation mechanical and electrical equipment, <br />elevators and escalators, security equipment, roof, curtain wall, doors and waterproofing. Extended <br />warranties shall be specified in the Construction Documents or specific written instructions from <br />the Owner. All such extended warranties shall either be provided by the CMAR or by a <br />Subcontractor or manufacturer. If the warranty is provided by a Subcontractor or manufacturer, the <br />warranty shall explicitly state that it is for the benefit of and may be enforced by the Owner. Such <br />warranties shall provide, at a minimum, for the repair or replacement of defective or non- <br />conforming components within the warranty period. Beyond its general twelve (12) month <br />warranty, the CMAR shall not be responsible for extended warranties given by a Subcontractor or <br />manufacturer, so long as the Owner has the benefit of and right to enforce the warranty. <br />14.3. Additionally, the Owner may bring an action against the CMAR for latent defects which are hidden <br />or not readily apparent to the Owner at the time of beneficial occupancy or final acceptance, <br />whichever occurred first, in accordance with applicable law. <br />14.4. The CMAR services shall extend through the completion of the warranty phase; once Project <br />Closeout is achieved, however, the CMAR's obligations and services are limited to Warranty <br />obligations. <br />15. ROYALTIES, LICENSES AND PATENTS <br />15.1. It is the intention of the Contract Documents that the Work covered herein will not constitute in <br />any way infringement of any patent whatsoever unless the fact of such patent is clearly evidenced <br />herein. The CMAR shall protect and save harmless the Owner against suit on account of alleged or <br />actual infringement. The CMAR shall pay all royalties and /or license fees required on account of <br />patented articles or processes, whether the patent rights are evidenced hereinafter. <br />16. PERMITS, INSPECTIONS, FEES, REGULATIONS <br />16.1. The CMAR shall give all notices and comply with all laws, ordinances, codes, rules and regulations <br />bearing on the conduct of the Work under the Contract. If the CMAR observes that the drawings <br />and specifications are at variance therewith, it shall promptly notify the Project Designer and <br />Owner in writing. Any necessary changes required after contract award shall be made by change <br />Page 16 of 53 <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.