Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />Orange County Detention Facility, Environment & Agriculture Center & Park Operations Base <br />Request for Qualifications (RFQ #5249) <br />•: r <br />PROJECT APPROACH <br />1. PROJECT PLANNING <br />(6) Document Tracking and Reporting <br />Proper communication with key stakeholders makes for a smooth, efficient project. Bordeaux uses a Communication <br />Portal called Procore to keep all project team members informed about schedules, meeting minutes, status of Requests for <br />Information (RFI), submittal coordination, and other important project information. We maintain and control the system <br />on a secured server, with permission granted to users at the level they need to work as part of the team. This system <br />allows everyone — the client, design team, our project staff, and subcontractors - instant access to the most current project <br />information. The benefit to you is immediate access to the most current project data available at all times, in a safe and <br />secure manner. 0 <br />Bordeaux emphasizes open communication between all parties of a <br />project. It is imperative that all project members have the ability to <br />communicate with our peers in the most efficient manner possible. <br />Whether this is done by letter, fax, e -mail, voice or the use of a central <br />database system, it absolutely must be addressed at the beginning <br />of a project in order to establish standards and expectations. Our <br />frequency and type of communication with our project partners, in <br />part depends on the purpose of the communication. Some examples <br />are as follows: <br />m <br />• Contracts and legal documents are typically handled in paperform. <br />• Some letters and correspondence may be handled via fax (we use this most frequently with our smaller subcontractors). <br />• Many general items are handled via e-mail (our most typical means of communication). <br />• Items that can be handled over the phone are immediately followed up with a "confirmation of conference" document <br />that is either electronic or in paper form that can be filed for future reference. <br />• Most project- specific information like submittals, RFI's, meeting minutes and such are managed with a central database <br />system. This system can be localized to the contractor or shared with the project partners via on -line system access <br />through the web. <br />2. MWBE OUTREACH <br />Describe your approach to encouraging minority participation on this project. Identify your five most successful projects relative to <br />MWBE participation, indicate the percentage achieved and if the MWBE goal was met or exceeded. <br />Bordeaux is committed to providing equal access and opportunities for the participation of Minority and Women <br />Owned Business Enterprises (MWBE's). Identifying and developing relationships with MWBE Contractors is an essential <br />component that we manage with our standard level of excellence. Bordeaux plans to meet a 20% MWBE participation <br />goal for the Orange County Detention Center project which will exceed the 10% HUB (MWBE) participation goal <br />pursuant North Carolina General Statute: 143 -128. <br />Bordeaux utilizes specific efforts to notify Minority and other HUB firms of upcoming opportunities. Our outreach efforts <br />are, but are not limited to the following: <br />• Bordeaux SmartBidNet <br />• Project Informational Sessions <br />• United Minority Contractors of North Carolina (UMCNC) <br />• Outreach Events <br />• State of North Carolina Department of Administration Office for Historically Underutilized Businesses <br />• Carolinas AGC (CAGC) <br />• North Carolina MWBE Coordinator's Network <br />• Local Plan Rooms <br />To assist in achieving our 20% MWBE Participation Goal, Bordeaux utilizes various programs which develop and <br />encourage participation by Minority and other HUB's.These programs have shown to stimulate contractor interest <br />from the HUB community and are instrumental in expanding relationships. They are (but not limited to) the following: <br />OR <br />
The URL can be used to link to this page
Your browser does not support the video tag.