Orange County NC Website
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />Orange County Detention Facility, Environment & Agriculture Center & Park Operations Base <br />Request for Qualifications (RFQ #5249) <br />•: r <br />PROJECT APPROACH <br />1. PROJECT PLANNING <br />The Estimator generates, maintains and updates a log of all "best cost solution" recommendations and assigns a <br />value to each idea. The Value Engineering Log contains "Accepted" "Not Accepted "and "Under Review" categories. <br />All "best cost solution" recommendations will be submitted to allow adequate time for such recommendations to be <br />studied, evaluated and, if deemed worthy, incorporated into the design. We include "Accepted" items in the contract <br />documents, discard the "Not Accepted" items, and place "Under Review" items as potential bid alternates until a final <br />decision is made. The owner will have the final authority on the acceptance, rejection or required action date of all <br />Value Engineering or "best cost solution" recommendations. <br />Our team provides continuous constructability analysis, document review, and estimate updates whenever <br />significant changes occur in the project after the schematic design estimate. We track all changes throughout the <br />preconstruction process with the Value Engineering Log. Between estimates, Value Engineering changes are tracked <br />with the Trend Log. We use these standard logs and detailed price sheets to track estimate details and item costs. <br />(2) Constructability Issues <br />The Project Team's overall goal is to produce an architecturally Interdisciplinary Constructability Review: <br />pleasing, fully functional facility that is easy to maintain and <br />operate. Bordeaux's team reviews the design documentation A <br />for clarity, completeness, constructability and coordination. This Clarity and Completeness <br />analysis ensures the drawings are complete and coordinated <br />Y g p Identify ambiguities, inconsisten3es, and missing <br />among disciplines, that construction details are workable, and that design detai Is <br />the building systems are the best for this project. <br />Constructability <br />During the process of preparing each estimate, the Estimator will .AssessEomtruttim effdB,ry,E=_effetive S,,ror6stency <br />collaborate with our Project Manager and Project Superintendent with traderapablities, cnrnple ity and logistic <br />to perform a formal review of the documents. Other members <br />of our team, such as our Mechanical /Electrical /Plumbing (MEP) Coordinaton <br />Estimator and Virtual Construction Manager and Building •Coordination between civil, a rchitectural, structural, <br />Information Modeling expert, also participate in this process. mechffy pote3tialsu comrac documents ork packagifi�tians; <br />g p p p p ide rtify pore rcialsubco rtrac[work package. <br />Each review is tailored to the stage of the design, or the level of <br />document completeness. Each member of the team thoroughly <br />reviews all building components, from site elements to structural systems, exterior enclosures, interiors, and <br />Mechanical /Electrical /Plumbing (MEP) systems. Each member of the team performs an independent review, after <br />which the team gathers to discuss their findings and develop a comprehensive list of comments to feed back to the <br />design professionals. All topics identified in this process are marked up on a set of drawings using Bluebeam Studio <br />software, which are submitted as part of the formal estimate. The Constructability Review document offers a visual <br />representation of request for clarification, along with our proposed recommendation to resolve the question. This <br />provides the design team with potential solutions based on the expertise and experience of our construction team. <br />The entire Project Team can then discuss various options at the next preconstruction meeting and develop the most <br />appropriate solution to benefit the project. <br />The Constructability Review document is updated at each estimate based on the revised status of the contract <br />documents.The Project Manager and Estimator review the current Constructability Review document at each <br />preconstruction meeting to track the status and ensure each matter is resolved in a timely manner.This information is <br />maintained and reported to the A/E and the Owner throughout the preconstruction phase up to the point where the <br />design is deemed "complete" <br />Bluebeam Studio provides common access to document reviews during the preconstruction phase of a project. <br />During construction, we provide a central set of linked construction drawings incorporating potential changes such as <br />Requests for Information and field clarifications. Hyperlinks make each detail easily searchable for the entire team. The <br />benefit to you is immediate access to the most current project data available at all times. <br />(3) Cost Estimating and Budget Management <br />Our Estimating Manager is responsible for the primary deliverables Bordeaux will provide for the project throughout <br />the Preconstruction Phase. During the Kick -Off meeting, the team will confirm the frequency of the estimates we <br />oil <br />