Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />Orange County Detention Facility, Environment & Agriculture Center & Park Operations Base <br />Request for Qualifications (RFQ #5249) <br />'a <br />QUALIFICATIONS AND EXPERIENCE <br />S. DETENTION CENTER EXPERIENCE <br />Provide a list of five (5) completed or at least (50 %) completed projects that demonstrate the firms construction <br />management experience with local detention facilities and prisons. <br />Bladen County Detention Center <br />Elizabethtown, North Carolina <br />Bladen County Detention is a 67,000 sf combination of 225 bed Detention <br />Center, Law Enforcement Center, and Emergency 911 call center for Bladen <br />County, North Carolina. The detention center was the first CM at Risk delivery <br />for Bladen County. The Detention area includes vehicular sally -port, intake <br />and booking, detention dayrooms and cells, centralized control room, <br />magistrate's offices, kitchen, video visitation and video arraignment, and <br />medical wing. The Law Enforcement area includes Sheriff's offices, training <br />rooms, and evidence storage. The E -911 call center includes space for (6) 911 <br />call stations, and associated equipment. <br />The structure is primarily load bearing CMU with steel barjoists and low <br />sloped roof. Exterior veneer is brick and accent architectural CMU water <br />table. Mechanical systems consist of package roof top units including smoke <br />control for 1 -3 Occupancy areas. Electrical system includes emergency <br />generator, lighting control, fire alarm, and lightning protection. The fire <br />suppression systems include both wet and interlocked pre- action with <br />pneumatic release for 911 call center server room. <br />The detention area housing consists of 105 pre- fabricated steel cells stacked <br />2- stories. Pre - fabricated cells are shipped with lights, penal fixtures, HVAC <br />grilles, final paint, toilet accessories. By fabricating cells in an assembly line <br />fashion in a controlled environment, pre- fabrication allows better quality <br />control and the ability to expedite schedule. An estimated two months of <br />project schedule were saved through pre- fabrication and BIM modeling. <br />W <br />Owner: <br />Greg Martin <br />Bladen County <br />106 E. Broad St., #105 <br />Elizabethtown, NC 28337 <br />Phone: 910.862.6701 <br />Architect: <br />Jason Hopkins <br />Moseley Architects <br />11430 North Community House Road, <br />Suite 225 <br />Charlotte, NC 28277 <br />Phone: 704.540.3755 <br />Contract Type: <br />Construction Management at Risk <br />Original Contract Amount: <br />$16,533,982 <br />Final Contract Amount: <br />$16,591,549 <br />*Project added sewage grinder required <br />by town. $24K of unused contingency <br />returned. <br />Schedule: <br />Days Allowed: <br />426 Calendar Days <br />Scheduled Completion <br />August 21, 2017 <br />Actual Completion <br />August 21, 2017 <br />Project Manager: J. Blair Bordeaux, P.E. <br />Proposed PM for Orange County <br />Superintendent: Ben Brisson <br />MBE Participation: 10.2% <br />Preconstruction Fee: $53K <br />CM Fees: 3.4% <br />General Conditions: 5.9% <br />
The URL can be used to link to this page
Your browser does not support the video tag.