DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />Project Designer for approval or disapproval; such approval or disapproval shall be made by the <br />Project Designer prior to the opening of bids. <br />9.5. The CMAR shall obtain written approval from the Project Designer for the use of products, <br />materials, equipment, assemblies or installation methods claimed as equal to those specified. Such <br />approvals must be obtained as soon after contract awards as possible and before any materials are <br />ordered. <br />9.6. The Project Designer shall adjudge the equality of proposed substitution of products, materials or <br />equipment, and its opinion shall be final, unless overridden by the Owner's Representative in <br />writing, subject to written appeal to the Owner. <br />9.7. If at any time during the construction and completion of the Work covered by these Contract <br />Documents, the conduct of any worker of the various crafts be adjudged by the Owner's <br />Representative a nuisance to the Owner or Project Designer, or if any worker be considered <br />detrimental to the Work, the CMAR and the Subcontractor shall order such parties removed <br />immediately from the site and its environs. <br />10. SUBCONTRACTS AND SUBCONTRACTORS <br />10.1. The CMAR shall determine the appropriate bid packages based on the available resources. One or <br />more bid packages shall be prepared for each of the general construction, electrical, mechanical, <br />fire protection, and plumbing divisions of the Work of the Project. The CMAR shall prepare any <br />other contract packages for other divisions or subdivisions of the Work. Each Subcontractor may <br />be required by the CMAR to provide bonds and insurance, consistent with the terms of the RFQ. <br />10.2. First -tier Subcontractors shall be pre - qualified by the CMAR. Only pre - qualified Subcontractors <br />are allowed to bid and contract with the CMAR on a Project. The CMAR and the Owner's <br />Representative shall confer on the prequalification of lower tier subcontractors, and the CMAR <br />shall decide whether to pre - qualify lower tier subcontractors after giving due regard to the Owner's <br />MWBE goals. The prequalification criteria shall be determined jointly by the Owner, Project <br />Designer and the CMAR to address quality, performance, time specified in the bids for <br />performance of the Contract, the cost of construction oversight, time for completion, capacity to <br />perform, and other factors deemed appropriate by the Owner. The CMAR shall publicly advertise <br />as prescribed in G.S. 143 -129; and shall accept bids from first -tier Subcontractors for all <br />construction Work and all General Conditions that are not being self - performed by the CMAR. All <br />bids shall be opened publicly and once they are opened, shall be public record under Chapter 132 <br />of the General Statutes. The CMAR shall award each contact to the lowest responsible, responsive <br />bidder, taking into consideration the Owner's requirements, quality, performance, time specified in <br />the bids for performance of the contract, the cost of construction oversight, time for completion, <br />compliance with G.S. 143 -128.2 and other factors deemed appropriate by the Owner's <br />Representative and advertised as part of the bid solicitation. If the low bid Subcontractor fails to <br />account for all costs associated with the scope of the Work on which it is bidding, then the bid may <br />be disqualified at the discretion of the CMAR or modified to show additional Project costs not <br />accounted for. If after modification, the apparent low bid is no longer low, then the CMAR shall <br />disqualify that bid and consider the next low bid submitted. The CMAR shall have the right as <br />outlined above to verify the scope of each low bid in the same manner until it determines the lowest <br />verified bid. <br />10.3. The CMAR shall conduct pre -bid meetings and award meetings for all contracts. The CMAR shall <br />notify the Owner and Project Designer of each such meeting and shall not hold any such meeting <br />without notification to the Owner and Project Designer. <br />10.4. The CMAR or Owner may reject all bids and repeat the bidding for a given division of Work or re- <br />package the Work activity. <br />Page 12 of 53 <br />Revised 10/17 <br />