Browse
Search
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:48:04 PM
Creation date
7/31/2018 12:38:32 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Document Type
Agreement - Construction
Agenda Item
6/19/18
Amount
$24,400,000.00
Document Relationships
2019-114-E AMS - Bordeaux Construction contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-325 AMS - Bordeaux Construction Co. Northern Campus construction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />APPENDIX A <br />Division of Project Cost Elements <br />IV. VERTICAL HOISTING <br />DESCRIPTION <br />BASIC FEE <br />GEN CONDS. <br />A/E COST <br />OWNER COST <br />COST OF WORK <br />Less than 25 Ton <br />X <br />X <br />X <br />25 Ton and Greater <br />X <br />X <br />X <br />NOTE: ALL PERSONNEL COSTS SHALL INCLUDE SALARIES AND APPROVED LABOR BURDEN <br />V. REPRODUCTION AND PRINTING <br />DESCRIPTION <br />BASIC FEE <br />GEN CONDS. <br />A/E COST <br />OWNER COST <br />COST OF WORK <br />Design Phase <br />X <br />X <br />Cost Study Documents <br />X <br />X <br />Systems Study Documents <br />X <br />X <br />Bid Package Documents <br />X <br />X <br />Post Bid Construction Documents <br />X <br />X <br />Accounting Forms <br />X <br />X <br />Field Reporting Forms <br />X <br />X <br />Contract Agreements <br />X <br />X <br />Schedule Report Forms <br />X <br />X <br />Estimating Forms <br />X <br />X <br />Cost Reporting Forms <br />X <br />Presentation Charts and Graphics <br />X <br />X <br />Value Analysis Studies <br />X <br />X <br />Data Processing (In- House) <br />X <br />X <br />Reference Materials <br />X <br />X <br />Duplication Expense (Misc.) <br />X <br />Shop Drawing Printing <br />X <br />Assemble and Print Maintenance Manuals <br />X <br />Assemble and Print Operation Manuals <br />X <br />Special Forms <br />X <br />Postage and Delivery Expense <br />X <br />NOTE: ALL PERSONNEL COSTS INCLUDE SALARIES AND APPROVED LABOR BURDEN <br />VI. QUALITY CONTROL <br />DESCRIPTION <br />BASIC FEE <br />G GN CONDS. <br />A/E COST <br />OWNER COST <br />COST OF WORK <br />Special Inspection Consultants <br />X <br />Special Testing Consultants <br />X <br />Concrete Testing <br />X <br />Masonry Testing <br />X <br />Compaction Testing <br />X <br />Welding Inspections <br />X <br />Soils Investigations <br />X <br />Special Testing Services <br />X <br />Field Office Supplies/Materials <br />X <br />Project Photographs <br />X <br />Warranty Inspection Coordination <br />X <br />Air & Water Balancing <br />X <br />Operator On -site Training <br />X <br />Prepare Operation Manuals <br />X <br />Prepare Maintenance Manuals <br />X <br />NOTE: ALL PERSONNEL COSTS SHALL INCLUDE SALARIES AND APPROVED LABOR BURDEN <br />
The URL can be used to link to this page
Your browser does not support the video tag.