DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8
<br />needed to prepare a comprehensive as -built record of the Project for delivery to the Owner in
<br />accordance with the Project Designer's contract.
<br />7.6. The CMAR shall devise, implement and maintain at the Project site, on a current basis, a structured
<br />document control system which includes and tracks records of all necessary contracts, RFI's, shop
<br />drawings, samples, purchases, materials, equipment, maintenance and operating manuals and
<br />instructions, and any other documents and revisions thereto which arise out of the Contract or the
<br />Work. These documents and copies thereof in paper or electronic form or both as requested shall be
<br />readily available to the Owner any time during the performance of this Contract. CMAR to intends
<br />to use Procore software; the Owner has no exception to this request.
<br />7.7. The CMAR shall arrange for and submit monthly to the Owner and Project Designer, as a General
<br />Conditions expense, progress photographs, organized by date into a sequentially labeled, three ring
<br />binders or approved electronic equivalent, in sufficient detail to properly record the Work.
<br />8. CODES AND STANDARDS
<br />8.1. Wherever reference is given to codes, standard specifications or other data published by regulating
<br />agencies including, but not limited to, national electrical codes, North Carolina state building
<br />codes, federal specifications, ASTM specifications, various institute specifications, etc., it shall be
<br />understood that such reference is to the latest edition including addenda published prior to the date
<br />of the Contract Documents.
<br />9. LABOR, MATERIALS AND EQUIPMENT
<br />9.1. The CMAR shall, unless otherwise specified, contract for and pay for all labor, transportation,
<br />materials, tools, construction apparatus, lights, power distribution, generators, heating apparatus,
<br />sanitary facilities, water distribution, safety equipment, scaffolding and incidentals necessary for
<br />the completion of the Work, shall arrange for the installation, maintenance and removal all
<br />construction equipment, utensils or things, and be responsible for the safe, proper and lawful
<br />construction, maintenance and use of same, and the CMAR shall construct in the best and most
<br />workmanlike manner, a complete Project and everything incidental thereto, as shown on the
<br />drawings, stated in the specifications, or reasonably implied there from, all in accordance with the
<br />Contract Documents.
<br />9.2. All materials shall be new and of quality specified, except where reclaimed material is authorized
<br />herein and approved for use. Workmanship shall at all times be of a grade accepted as the best
<br />practice of the particular trade involved, and as stipulated in written standards of recognized
<br />organizations or institutes of the respective trades except as exceeded or qualified by the
<br />specifications.
<br />9.3. As set forth in the Construction Documents or upon reasonable notice from the Owner's
<br />Representative, the CMAR shall require the Subcontractors to furnish warranties and evidence as to
<br />quality of materials.
<br />9.4. Products are generally specified by the American Society for Testing and Materials ( "ASTM ") or
<br />other reference standard and/or by manufacturer's name and model number or trade name. When
<br />specified only by reference standard, the CMAR may select any product meeting this standard, by
<br />any manufacturer. When several products or manufacturers are specified as being equally
<br />acceptable, the CMAR has the option of using any product and manufacturer combination listed.
<br />However, the CMAR shall be aware that the cited examples are used only to denote the quality
<br />standard of the product desired and that they do not restrict bidders to a specific brand, make,
<br />manufacturer or specific name; that they are used only to set forth and convey to bidders the
<br />general style, type, character and quality of product desired; and that equivalent products will be
<br />acceptable. Request for substitution of materials, items, or equipment shall be submitted to the
<br />Page 11 of 53
<br />Revised 10/17
<br />
|