Browse
Search
2018-306-E Emergency Svc - TJCOG triangle regional resiliency assessment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-306-E Emergency Svc - TJCOG triangle regional resiliency assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 1:02:49 PM
Creation date
7/31/2018 12:36:08 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Ending Date
6/30/2019
Contract Document Type
Agreement - Services
Amount
$3,000.00
Document Relationships
R 2018-306 Emergency Svc - TJCOG triangle regional resiliency assessment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 2000DA7F- 9978 -48A1- 8458- 8C7628BD4EA2 <br />[Departmental Use Only] <br />TITLE Triangle Regional <br />Resiliency Assessment <br />FY 18 -19 <br />NORTH CAROLINA <br />SERVICES AGREEMENT UNDER $90,000.00 <br />NO RFP /RFQ <br />ORANGE COUNTY <br />This Services Agreement (hereinafter "Agreement "), made and entered into this 1st day of <br />July, 2018, ( "Effective Date ") by and between Orange County, North Carolina a political <br />subdivision of the State of North Carolina (hereinafter, the "County ") and Triangle J Council of <br />Governments (TJCOG), (hereinafter, the "Provider "). <br />WITNESSETH: <br />That the County and Provider, for the consideration herein named, do hereby agree as <br />follows: <br />1. Services <br />a. Scope of Work. <br />i) This Agreement is for services to be rendered by Provider to County with respect <br />to (insert type of project): Project management and meeting faciliation by TJCOG, <br />the Provider, as Stage 2 for the project described in Attachment A to amend and <br />disseminate the TRIANGLE REGIONAL RESILIENCY ASSESSMENT. The <br />contract outlining Stage 1 was signed on May 24, 2017. <br />ii) By executing this Agreement, the Provider represents and agrees that Provider is <br />qualified to perform and fully capable of performing and providing the services <br />required or necessary under this Agreement in a fully competent, professional and <br />timely manner. <br />iii) Time is of the essence with respect to this Agreement. <br />iv) The services to be performed under this Agreement consist of Basic Services, as <br />described and designated in Section 3 hereof. Compensation to the Provider for <br />Basic Services under this Agreement shall be as set forth herein. <br />2. Responsibilities of the Provider <br />a. Services to be provided. The Provider shall provide the County with all services <br />required in Section 3 to satisfactorily complete the Project within the time limitations set <br />forth herein and in accordance with the highest professional standards. <br />b. Standard of Care. <br />i) The Provider shall exercise reasonable care and diligence in performing services <br />under this Agreement in accordance with the highest generally accepted standards <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.