Browse
Search
2018-298-E AMS - Harris Bros Electric Lower Level Link FA Upgrade
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-298-E AMS - Harris Bros Electric Lower Level Link FA Upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 5:31:09 PM
Creation date
7/20/2018 1:13:09 PM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Ending Date
7/23/2018
Contract Document Type
Agreement - Construction
Amount
$20,998.00
Document Relationships
R 2018-298 AMS - Harris Bros Electric Lower Level Link FA Upgrade
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 25BB104C- 540C- 40B8- B9F5- F9CF8C4AACE9 <br />Project: John Link Bldg LL Alterations <br />r Customer Reference: SimplexGrinnell Fire Alarm <br />Johnson Controls Reference: 250439764 <br />Johnson Date: 06/19/2018 <br />Controls Page 2 of 7 <br />Johnson Controls Quotation <br />Comments (continued) <br />THIS PROPOSAL IS BASED UPON ONLY THOSE ITEMS DENOTED BY [X]" <br />[] Specification section: <br />[x] Information from plan Drawing Number and Date: E2.1 by RN &M dated 5 -25 -18 <br />[] Up to and including addendum: <br />[] Customer provided bill of material <br />[] Verbal request/ Counts provided by contractor no plans or specification <br />[] Value engineering <br />[] Design Build <br />THIS QUOTATION INCLUDES ONLY THOSE ITEMS DENOTED BY "[X] ": <br />[x] Equipment as listed in this proposal <br />[x] Installation of FA wiring and devices in conduit provide by others <br />[] Installation of fire alarm conduit system <br />[] Installation of free run / open air wiring with J hooks & Stub ups by SimplexGrinnell <br />[x] Installation of free run / open air wiring with J hooks & Stub ups by Contractor <br />[] Demolition of existing fire alarm devices <br />[x] NC State Sales Use Tax <br />[x] Freight (F.O.B. shipping point) <br />[x] Shop Drawings <br />[] PE Sealed Drawings <br />[x] Panel terminations <br />[x] Technical installation support including programming <br />[x] Permit <br />[] Inspection Fees <br />[] Customer fees for bypass /shutdown of systems <br />[] Payment/Performance Bonds <br />[x] 1 functional system certification test <br />[x] 1 AHJ test <br />[] 1 10% Re -Test <br />[] 2 Hours of operation and maintenance training <br />[] Close out documentation <br />[x] Interface to non - SimplexGrinnell provided equipment i.e.: HVAC and elevator <br />[x] One year standard warranty <br />[] Monitoring <br />[] AHCA Inspection <br />[] UL Certification <br />THIS QUOTATION DOES NOT INCLUDE THE FOLLOWING: <br />Conduit or Bridal Rings <br />Phased Checkout <br />Standard electric boxes, including ceiling mounted devices <br />120vac power (New NAC Panel next to existing FRCP) <br />Fire protection switches or gas solenoids <br />Phone lines <br />Remote station monitoring contract (available upon request) <br />Fire, Security, Communications, Sales & Service <br />Offices & Representatives in Principal Cities throughout North America <br />
The URL can be used to link to this page
Your browser does not support the video tag.