Browse
Search
2017-663 DEAPR - Seven Mile Creek parking area
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-663 DEAPR - Seven Mile Creek parking area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2018 11:00:16 AM
Creation date
7/16/2018 5:26:15 PM
Metadata
Fields
Template:
Contract
Date
12/12/2017
Contract Starting Date
12/12/2017
Contract Ending Date
3/14/2018
Contract Document Type
Agreement - Construction
Amount
$63,000.00
Document Relationships
R 2017-663 DEAPR - Seven Mile Creek parking area
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: CF08811 B -991 E- 4A3C- 87AA- FE61013F9A61 <br />[Departmental Use Only] <br />TITLE Sevenmile Ck parking Area <br />FY 2018 <br />NORTH CAROLINA <br />CONSTRUCTION AGREEMENT UNDER $250,000.047 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement), made as of the twelfth <br />day of December, 2017, by and between McQueen Construction Inc., (hereinafter called the <br />"Contractor"), and Orange County, a body politic and a political subdivision of the State of North <br />Carolina, (hereinafter called the "Owner "). <br />WITNESSETH: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br />a. This Agreement. <br />b. Designer Approved Bulletins and/or Field Orders. <br />c. Request for Proposals and addenda thereto. <br />d. Proposal. <br />2. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice -to- Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />a. Construction Drawings prepared by Orange County (Sheet SDI dated September 26,2017) <br />b. Written specifications prepared by the project engineer. <br />c. Miscellaneous Paving at Sevenmile Creek Access Area (Base Bid and Add Alternate i) <br />proposal dated October 18, 2017 which fully describes the work to be performed. Such <br />work will hereafter be called the "Work ". <br />d. Related documents listed under Section 1 above. <br />Revised 10117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.