Browse
Search
2018-266-E AMS - Sasser Company BOE attic remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-266-E AMS - Sasser Company BOE attic remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 9:29:13 AM
Creation date
7/6/2018 11:53:47 AM
Metadata
Fields
Template:
Contract
Date
7/5/2018
Contract Starting Date
7/5/2018
Contract Ending Date
9/1/2018
Contract Document Type
Agreement - Construction
Amount
$78,232.00
Document Relationships
R 2018-266 AMS - Sasser Company BOE attic remediation
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 801F762B- 7B05- 489A- 99F8- 257DC55396A6 <br />Orange County Board of Elections <br />208 South Cameron Street <br />Hillsborough, NC 27278 <br />June 22, 2018 <br />GENERAL CONDITIONS <br />• Site supervision <br />• Project management <br />• Dumpsters <br />• Daily clean up <br />• Final clean <br />• Permit <br />SCAFFOLDING <br />• Erection, one (1) month rental and dismantling of one (1) stationary scaffolding 5' wide <br />x 12' long x 18' tall. We will provide a 5' wide bridge from scaffolding to the dormer on <br />roof. One plastic trash chute will be hung from the end of the scaffolding. Stair access is <br />also provided. <br />DEMOLITION <br />• Removal and disposal all drywall with asbestos containing joint compound, carpet, case <br />work, base molding, shoe molding, insulation, sinks, toilets and flooring. All work to be <br />performed within negative pressure containment. Third party, Trinity Environmental, LLC <br />PCM air clearance testing after the demolition is completed is included. A waste manifest <br />will be provided as proof of proper disposal of asbestos containing materials. <br />PLUMBING <br />• All water supply and waste lines will be removed and capped below the subfloor. <br />ELECTRICAL <br />• Demolition of existing electrical outlets, light switches and light fixtures. Removal of all <br />electrical wiring and conduit in the attic back to the electrical panel. <br />ITEMS NOT INCLUDED <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.