Browse
Search
2018-266-E AMS - Sasser Company BOE attic remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-266-E AMS - Sasser Company BOE attic remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 9:29:13 AM
Creation date
7/6/2018 11:53:47 AM
Metadata
Fields
Template:
Contract
Date
7/5/2018
Contract Starting Date
7/5/2018
Contract Ending Date
9/1/2018
Contract Document Type
Agreement - Construction
Amount
$78,232.00
Document Relationships
R 2018-266 AMS - Sasser Company BOE attic remediation
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
View images
View plain text
DocuSign Envelope ID: 80lF762B- 7BO5- 489A- 99F8- 257DC55396A6 <br />[Departmental Use Only] <br />TITLE 208 S Cameron Attic Demo <br />FY 2018 -19 <br />NORTH CAROLINA <br />CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement "), made as of the 5th day <br />of July, 2018, by and between Sasser Companies, Inc, (hereinafter called the "Contractor "), and Orange <br />County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br />"Owner "). <br />WITNESSETH: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br />a. This Agreement. <br />b. Designer Approved Bulletins and/or Field Orders. <br />c. Request for Proposals and addenda thereto. <br />d. Proposal. <br />2. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice -to- Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />a. Construction Drawings prepared by N/A (Sheet N/A dated N /A) <br />b. Written specifications prepared by the project engineer. <br />c. Sasser Companies, Inc proposal dated June 22, 2018 which fully describes the work to be <br />performed. Such work will hereafter be called the "Work ". <br />d. Related documents listed under Section 1 above. <br />3. TERM AND SCHEDULING <br />Revised 10/17 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).