Orange County NC Website
<br />Twin Creeks Park <br />Phase 1 <br />A Possible Timetable <br />Tentative schedule, subject to change <br />If the Master Plan is adopted in May, 2005, the above schedule would result <br />in: <br />Cai~rboro CUP approval - Late-spring 2007 <br />Conshuction begimling - Spring 2008 <br />Opening of the park (Ph 1) - Spring 2009 <br />