Orange County NC Website
April 14,2005 <br /> Comparison of Preliminary Manager's Recommended County Capital Priorities and Pay-As-You-Go Capital <br /> Projects (1) <br /> Fiscal Years 2005-06 Through 2014-15 <br /> Reflects Ten-Year Funding Totals of Options Presented to the BOCC on March 31, 2005 <br /> Funding/Project Description Priority Baseline Option#1 Option#2 Option#3 Option#4 <br /> Install or update life safety and security systems at all County <br /> facilities. As a pilot project in fiscal year 2005-06,exterior doors at <br /> 35 Building Entry Access Control Systems the Whiffed Center buildings would be unfitted with door access 2 425,000 425,000 350,000 475,000 450,000 <br /> controls to determine best system to meet security needs. Other <br /> facilities would be addressed as future funding allows. <br /> Funding would create a reserve fund from which the SOCC would <br /> 36 County Facility Arts Reserve allocate monies to construction and renovation projects to allow for 2 60,000 100,000 100,000 100,000 100,000 <br /> arts in County facilities. <br /> Includes rewiring building,sewer line replacement. Painting, <br /> 37 Court Street Annex/112 N.Churton Street flooring,waterproofing,HVAC,roofing would be addressed through 2 55,000 55,000 55,000 55,000 55,000 <br /> funding in those individual projects <br /> Funds to provide matching funds that would either purchase <br /> additional generators or enable the County to take certain facilities <br /> 38 Emergency Power Sources "off the grid"so that the primary(or perhaps backup)power would 2 50,000 50,000 50,000 50,000 0 <br /> not be dependent on the electrical utilities power distribution <br /> system. <br /> Painting,#oonng,waterproofing,HVAC,roofing would be <br /> 39 Government Services Annex addressed through funding in those individual projects;funding in 2 15,000 15,000 15,000 15,000 15,000 <br /> would allow for realigning and securing the metal fire escape <br /> located at the rear of the building. <br /> 40 Lake Michael Park Funds to assist City of Mebane with park maintenance and upfils 2 0 75,000 75,000 75,000 75,000 <br /> 41 Northern Human Services Center Repairs Wastewater treatment and water supply recommended for funding 2 1,000,000 650,000 325,000 1,000,000 1,000,000 <br /> from 2004 two-thirds net debt funding(in fiscal year 2004-05) <br /> Renovations that would be required after New Land Services <br /> 42 Planning 8 Ag Building Renovations Building construction is complete and office relocations have 2 200.000 200,000 200,000 200,000 200,000 <br /> occurred(outlined in the 2005 Space Study Update) <br /> 43 Whiffed Human Services In accordance with the 2005 Space Study Update,funding for 2 0 0 0 0 0 <br /> project would not be needed pnor to fiscal year 2015-16 <br /> 45 Total County Long Range Projects 7,757,500 28,027,500 25.802,500 28,377,500 28.503.500 <br /> 46 Total Recommended Recurring and Long Range County Capital Projects By Option(Difference in revenues 44.013,000 60,169,000 56,438.000 68,879,000 65,094,000 <br /> and expenditures may be slightly different due to rounding) <br /> Page 26 of 26 options for aprl 14 worksession.xlssummary <br />