Orange County NC Website
April 14,2005 <br /> Comparison of Preliminary Manager's Recommended County Capital Priorities and Pay-As-You-Go Capital <br /> Projects (1) <br /> Fiscal Years 2005-06 Through 2014-15 <br /> Reflects Ten-Year Funding Totals of Options Presented to the BOCC on March 31, 2005 <br /> Funding/Project Description Priority Baseline Option#1 Option#2 Option#3 Option#4 <br /> Includes upgrading/replacing elevator equipment. Funding in fiscal <br /> year 2005-06 provides for improvements at the Whitted Human <br /> 17 Elevator Repairs and Improvements Services Center since that elevator has experienced service 2 995,000 680,000 680,000 650,000 880,000 <br /> problems in the last few months. Funding in future years would <br /> allow for repairs at other County facilities including the Historic <br /> Courthouse and Jail. <br /> Repairstreplacements of stonework and bricks(including retaining <br /> 18 Masonry repairs walls);specific buildings that would be addressed each year 2 10U00 100,000 80,000 100,000 90,000 <br /> dependent on amount of funding available <br /> Water Demand Reduction Systems and Upfit appropriate County facilities with water reduction demand <br /> 19 Equipment fixtures and apparatus;specific schedule would be dependent on 2 100,000 100,000 80,000 100,000 90,000 <br /> amount of fundino available each year <br /> 20 Total County Recurring Capital 36,255,500 32,141,500 30,635,500 40.501,500 36,590,500 <br /> 21 Long Range Capital Projects <br /> To make County facilities compliant with ADA requirements and <br /> ensure that public buildings are accessible to all County residents <br /> and employees. Highest priority would be given to the following <br /> 22 ADA Compliance facilities: Clerk of Courts Annex located on Churton Street 1 320,000 500,000 450,000 525,000 500,000 <br /> (installation of bill, Historic Courthouse and Graham Building <br /> (Renovations of ramps)and Planning&Agriculture Building <br /> (Renovations of ramps and walkways at rear of building). Other <br /> facilities would be addressed as future funding allows. <br /> Includes wall construction and installation of awnings at building <br /> 23 Animal Shelter(current facility) entrances;kennel painting would be covered in Painting Project 1 29,000 29,000 29,000 29,000 29,000 <br /> (located later in this spreadsheet). <br /> Funds to provide for conservation easements and other sensitive <br /> lands that may not be open to public access. These monies may <br /> 24 Conservation Easements also be used as matching funds for grants;specific properties to be 1 1,600,000 1,700,000 1,000,000 1,500,000 1,700,000 <br /> funded would be determined each year based on available funding. <br /> 25 Dickson House Regiaze windows and realign gutters:painting of structure would be 1 7,500 7,500 7,500 7,500 7,500 <br /> covered in Painting Project(located later in this spreadsheet). <br /> Installation of fire alarm systems in buildings that are not currently <br /> 26 Fire Alarm Systems equipped with ones;facilities would be addressed as funding 1 115,000 115,000 115,000 115,000 115,000 <br /> streams allow. <br /> Painting,flooring,waterproofing,HVAC,roofing,and masonry <br /> 27 Histonc Courthouse Repairs repairs would be addressed through funding in those individual 1 15,000 15,000 15,000 15,000 15,000 <br /> projects;funding in fy 2005-06 would cover clock preservation. <br /> Funds to purchase properties for Lands Legacy program;specific <br /> 26 Lands Legacy properties to be purchased would be determined each year based 1 1,600,000 1,700,000 1.000,000 1,500,000 1,700,000 <br /> Ion available funding <br /> Page 24 of 26 options for apnl 14 worksession.xissummary <br />