Orange County NC Website
April 14,2005 <br /> Manager's Preliminary Recommended Option 2 County Capital Priorities and Pay-As-You-Go Capital Projects(1) <br /> Fiscal Years 2005-06 Through 2014-15 <br /> Fundingwrotect Description Priority 2005-06 2006.07 200748 1 2008-09 2009-10 2010d1 1 2011-12 2012.13 2013-14 2014-05 Total <br /> Interior and exterior painting of county facilities:higher poorly <br /> facilities funded in fiscal year 2005-06 include Animal Control <br /> (S21.500),Animal Shelter(550,000),Court Street Annex <br /> (S50,000),Dickson House(S30,0001.Historic Courthouse <br /> f0 Painting(Interior and Extenor)o (S2,500),Elland Community Center(510.000),Government 1 M.000 225.000 E <br /> 200,000 200,000 200,000 200,000 200,000 200,000 200,000 2,052,000 <br /> Facilities Services Annex(S37,000),Sheriffs Department(S26,000); <br /> additional buildings that would be addressed in outer years are <br /> dependent an amount of funding available;to the extent possible <br /> and necessary,painting for each facility would be done in <br /> conjunction with other facility improvements such as flooring. <br /> Parking lot improvements(including paving)for all county facilities; <br /> it Parking Lot RepaiNPaving funding in fv 2005-06 provide for paving WHSC loll;additional 1 190.000 100.000 50,000 50.000 50,000 50,000 50,000 50,000 50,000 50,000 690.000 <br /> parking areas that would be atltlressed in outer years are <br /> dependent on amount of fundingavailable. <br /> Repairs and replacement of county factiilies roots;highest priority <br /> replacements and repairs include Orange Enterprises(current <br /> 12 Roofing Projects facility).Planning and Agriculture Building,Nonhem Human 1 200,000 250,000 250,000 250,000 200,000 100,000 300,000 300.000 300,000 300.000 2,450.000 <br /> an Seces Center,Skills Development Center,501 West Franklin <br /> Street;these would be completed in accordance with CTL <br /> Engineering report. <br /> Releaus/replacements of extenar and interior signs located at all <br /> 13 Signage County;highest chanty projects would include replacing signs that 1 10,000 10,000 10.000 10.000 10,000 10,000 10,900 10,000 10,000 10,000 100.000 <br /> are beyond repay;specific replacementimpair schedule would be <br /> dependent an amount of funding available each year <br /> Replacement of mutme fencing and signage at sites included in <br /> Solid Waste Convenience early years ofplan;outer years allows for replacement of waste <br /> t4 Centers containers and installation of concrete pads.banters antl 1 60,000 85,000 85,000 85,000 85.000 55.000 85,000 85,000 65.000 85.000 845,000 <br /> drwmAws;Baseline funding would not allow for potential cost to <br /> purchase curn-enth,leased sites. <br /> Professional studies,as needed or required,to assess vanous <br /> infrastructure or mechanical systems at County facilities. <br /> 15 Assessments and Testing 2 75,000 10.000 10,000 10,000 10,000 10,000 10,000 10,000 10,00000 10.000 165,000 <br /> Examples would include air quality sampling,Roofing or HVAC <br /> studies. <br /> Capital RepairslReplacemenl Reserve funds would enable Public Works to address major <br /> 16(Emergency)Reserve Fund sysleMcomponent needs,abatement,etc.that may onse after 2 25,000 50,000 50,000 50.000 5Q000 50.000 50,000 50,000 50.000 50.000 475,000 <br /> bud etis adopted. <br /> Includes upgrading/replacing elevator equipment. Funding in <br /> fiscal year 200506 provides for improvements at five Whiffed <br /> Elevator Repairs and Human Services Center since that elevator has experienced 2 140,000 60,000 60.000 60,000 60,000 60,000 60.000 60,000 60,000 60,000 680,000 <br /> 17 improvements seance problems in the last few months. Funding 1n future years <br /> would allow for repass at other County facilities including the <br /> Historic Courthouse and Jail. <br /> Repairsrrepiacements of stonework and bricks(including draining <br /> to Masonry reprors walls);specific buildings that would be addressed each year 2 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 0 0 80,000 <br /> dependent on amount of fundingavailable <br /> Water Demand Reduction Upfit appropriate County facilities with water reduction demand <br /> 19 WatSyster <br /> Demand <br /> s and Reduction <br /> Fixtures and apparatus;specific schedule would be dependent on 2 10,000 t0,000 10,000 10,000 10.000 10,000 10,000 10,000 0 0 Bg000 <br /> amount of fundingavailable each ear <br /> 20 Total County Recurring Capital 2,991.000 3,204,500 3,ifiesm0 3,085,000 2,63saflo 2,535,000 2,735.000 3,235,000 L= <br /> 3,415,000 301635,500 <br /> 21 Long Range Capital Projects <br /> Page 11 of 26 options for apol 14 wor eness l n.xisopeon 2 <br />