Browse
Search
Agenda - 04-12-2005-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 04-12-2005
>
Agenda - 04-12-2005-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:48:39 PM
Creation date
8/29/2008 10:15:10 AM
Metadata
Fields
Template:
BOCC
Date
4/12/2005
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20050412
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~7 <br />Animal Shelter site) by the Dec. 3ldeadline, subject to completion of'the new Public Works <br />facilities on schedule and not finding anything untoward in the cleanup (fuel tank issues, for <br />example). Unlike the Animal Shelter site, the Solid Waste facility is physically integrated with <br />Public Works and cannot reasonable be left free standing/untouched. <br />Miscellaneous Issues <br />• Landfill staff are capable of performing rough grading of the site, saving an as yet <br />undetermined amount of expense. <br />• The building is being planned to accommodate a modest growth in spacial needs by including <br />one extra office space. <br />• The site layout and entranceway would be significantly improved with the acquisition of the <br />adjacent property, which has previously been available for sale. <br />• Anew, fully integrated phone and messaging system is envisioned to replace the two existing <br />(administrative offices and landfill facilities) systems. The primary phone system is <br />incorporated into the Town of Chapel Hill Public Works system. <br />• existing furniture will be utilized to the extent possible. <br />• Parking for employee's personnel vehicles as well as some county vehicles will be provided. <br />• The building will be wired with high-speed fiber optic cable for computer system. Capability <br />with the County system. The new Operations Center will be the hub for all telephones and <br />computer systems that are currently in place and all future expansions to be located at the <br />Eubanks Road facility. <br />This memorandum summarizes the conceptual development plan for the proposed new solid <br />waste operations center, Staff has recently reviewed this plan with Commissioners Halkiotis and <br />Jacobs. Staff awaits BOCC endorsement of the conceptual plan prior to requesting award of the <br />architectural contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.