Orange County NC Website
FASTER Response: The FASTER COTS Implementation Includes three (3) separate sessions <br />of meeting and training, The System Overview Meetings (SOMS), the Configuration Training, <br />and the System Training/GO-Llve. Sample Agendas are provided below: <br />Sample COTS Training Overview <br />Configuration Training <br />Thus training agenda provides details of the two, four -hour Configuration Training sessions <br />and the Bluing Accounts Training session. These session are for your FASTER System <br />Administrator and your Business Process Owners (8PO) to Identify how you want your <br />FASTER Web system settings, fields and plcklists to be set: up. After the training sessions, <br />your FASTER System Administrator will perform and complete your setup for Go -Uve. <br />Conllgvntion Training Session #1 - (4 Hours) <br />Assets <br />Settings <br />o Depreciation Method <br />I PM Hlerarchy Highest Type <br />• PM Is Hierarchical <br />• PM Update Early late <br />• PM Update body Late Cycle <br />I PM User Current <br />o Use Auto Acquisition Number <br />0 Reset Begin PY Reading <br />• Fields (Approximately 153 Standard, Plckllst, and Re -Label Melds) <br />Inventory <br />Settings <br />• <br />Melds (Approximately 76 Standard and Plckllst Melds) <br />o Barcode Segings (If Barcode Add -on a in SOW) <br />• Ba code Field <br />• Baroade Label Size <br />• Default Printer <br />• Merge Parts <br />• Part Name <br />�� <br />• Reassigning Parts <br />FA#"J R••�����R � Response to 5343 for Orange County, NC (Page 31 <br />