Orange County NC Website
pools. The Flexible rate structures and consolidated billing provides the ability to <br />manage pools and loaners separately where desired. <br />SOFTWARE CUSFOMIZATICHS AND ENHANCEMENTS <br />Please provide Information regarding the capability to provide Me County wIM wo ara <br />customgzallons, Including all applicable rates. In addltlon, Include lnRVmatkn on peranc <br />system enhancements and updates, <br />FASTER Response: FASTER has extensive experience creating Nmornizatlons as customer <br />need has required. Thane customlzat ons Include but are not limited to Integrations, exports, <br />reports, and database triggers. Customization effort Is estimated based on your specific <br />requirements, the cast and assodatd support lee for any proposed customizations Is <br />Identifled In the SOW. The customization's support fee Includes FASTER upgrading your <br />customization M ensure It works with newer versions of FASTER Web. <br />FASTER releases a major version of FASTER Web every 12 -1N months, access to the new <br />release are Included In your annual support casts. Occasionally, Interim versions are <br />released to add smaller features or address Imes. <br />LICENSING MODEL <br />Please describe your Scanning models (e.g., concurrent user, named user, revenue, <br />Mansaction volumes, etc.J andpmwde examples. <br />FASTER Reepons n FASTER Web ptldng Is based on standard active parent assed 11th unlimited <br />rs. We define ast andard parent active asset as a primary asset with an odglnal oust of$S,000 or <br />greater and maintenance Is actively being tracked In the system. <br />HARDWARE REQUIREMENTS <br />Pleas provide all hardware speclECalbns including servers, workstations, and other <br />equipment. Include estimated casts (Ifappllcaboll In Section R (AOpeo lx S). <br />FASTER Response: In addition m Section S (Appendix R), our FASTER Web System, <br />Environment, & COhNguretion Requirements document Is provided as "Appendix 0- <br />FASTER Web System, Environment, R Configuration Requirements" allached A this <br />response. <br />The County expects to expand Its Integration and EddMwAx; with key systems. Pleas <br />describe any current capabilities, partnerships, or future ronslde2llons for Me following <br />types of appgcations/spstems Mat have been savaged In MIS RFP, Including: <br />I WWalkeaerrrLR[ NAPAparts <br />FAAResponse to 5243 for Orange County, NC I Page IS <br />