Browse
Search
2018-238 AMS - CCG Systems Faster Asset Solutions
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-238 AMS - CCG Systems Faster Asset Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:57:01 PM
Creation date
7/2/2018 9:01:11 AM
Metadata
Fields
Template:
Contract
Date
7/1/2018
Contract Starting Date
7/1/2018
Contract Ending Date
6/30/2028
Contract Document Type
Agreement - Services
Agenda Item
6/19/18
Amount
$212,459.00
Document Relationships
R 2018-238 AMS - CCG Systems Faster Asset Solutions
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Application Server Hardware: <br />Mines arc minimum spars your use may require signbraneN more rtsmnces.) <br />W FASTER and cannot be sharetl. <br />Processor <br />2 Processor, 2.0 GHZ CPU <br />Memory <br />- 4 GB RAM <br />Hard Drive <br />- 15K RPM Primary Hard Drive, BO GB Free Disk Space <br />Network Connection <br />- GlgabR Ethernet Network Awder QHC) <br />Database /Reporting Services Server Hardware <br />(Vaasa arc mbzlmam spem your use red mquhm sbnifiomly more resources.) <br />musbakor <br />- 2 Processors, 2.0 Gila CPU <br />Memory <br />- 12 GB RAM ps GB dedicated to the Database Server, 4 GB dedicated W the OperrUng System) <br />NoHr If you are using a shared database server, It Is critical that It haw enough RAM, Due W the <br />umber of users and the high dependency on FASTER Be work tasks and reporting, FASTER Is often be <br />most mcenstve database on a shared database server, <br />Hard Drive <br />- 15K RPM Primary Hand area, funds Me size of the database will not be knowable ungl data Conversion Is <br />complete, be following are recommendations for Initial deployment But Is nlllcal to haw significant <br />head room so that Mere Is ample space for the database to grew over time: <br />For current FASTER Win customers migrating W FASTER Web, we recommend as a minimum <br />that you tem Me unamprtssed size of a FASFER Win database .bak file and multiply that <br />by 4 times. (Pkase remember, Mk will powers for ample mom for being able to cream a <br />backup file and head mom far the growth of me database.) <br />For a msWmer new W FAST the customers IT Were would be the best equipped to <br />estimate the Potential size of the Ntare daobax. FASTER Web databases can range In size, <br />demanding on number of aware and were of history, between 5 OB and 100 GB. Reese <br />remember In addutmn to estimating the dre of the database, you want to leave enough <br />m ter hacking up of the database and growth of the database. you may want to ensure <br />Nat you have 200 GB of total MN drive space to start Me pmJect and once you are Ilve on <br />FASTER Web, you will have more clarity on what the actual ham drive sands will need to be <br />Network Connection <br />- GlgabR Ethernet Network Adapter (NIC) <br />3: Three Server Configuration — Basic Enterprise <br />n/ EM Environment, System B Configuration parameters for FASTER Web 6.41 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.