Browse
Search
Agenda - 04-12-2005-8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 04-12-2005
>
Agenda - 04-12-2005-8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:49:23 PM
Creation date
8/29/2008 10:14:51 AM
Metadata
Fields
Template:
BOCC
Date
4/12/2005
Document Type
Agenda
Agenda Item
8b
Document Relationships
2005 S Purchasing - Amend #3 to Purchase Agreement for Orange Co Campus of Durham Tech Community College
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2005
Minutes - 20050412
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
S Declaration of Covenants, Conditions, and Restrictions Orange Co. Campus, Durham Technical Community College Property
(Linked From)
Path:
\Board of County Commissioners\Various Documents\2000 - 2009\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/~ <br />October 26, 2004 <br />DURHAMJECH-.ORANGE COUNTY CAMPUS <br />FACADE DESCRIPTION <br />FJ(ECUTNE SUMMARY <br />The intent of this document is to define the architectural character of the <br />sre/w w• eov+Eras ^'^ buildings} to be erected by Durham Technical Community College on their new campus <br />.baN.s.w„s hu <br />w. u~. wntson nrn in the development of Waterstone. Tire property is located ih Orange County and more <br />speaficafly in Hillsborough, Nc. <br />The Trump Group, es the developer, wishes to define the use of building <br />,ee r~rr«a nvaus matedals and to soma extent, the architectural character of the buildings and, in order to <br />nsxem~, sc zeso, achieve this goal, and in an effort to cleady define this emleavor to Durham Tech, The <br />Trump Group offers the college the following drawings end written descriptions. <br />aze/zss•ss9z 1.. Front elevation,rendenng(iromcommonsarea}. <br />2. Rear elevation rendering (from the main road below). <br />raaamile: 3. Detail ofa building earner. <br />828/238-9988 4, Written descripflon with percentage of use~of each material shown. <br />Il is not the Trump Group's Intentto propose an actual design for Durham Tech's <br />e-mae: building; but to define their expecfadonsthrough-the renderings and written descdp8on. <br />inPoObewnrch cam <br />BUILDING DEFINITION <br />wxv.b~ewsrrear.omn Ageneral site plan, prepared by The Trump Group, was presented to Durham <br />Tech and accepted as the standard bcetion for roads and adjoining sites: In partnership <br />with Durham Tech, the building envebpe materials were determined to cnnsiet o- the <br />following: <br />1.. Brick veneer. <br />2. Cast einne:detaiiing <br />3, Architectural standing seam metal rnof <br />4. VYindowe suitable to meetcode. <br />Furthermore, the college ihdkxted that the initial building would most likely be a <br />(2} story strtrdure antl that a student commorfs or quadrangle, would also be presets. In <br />ardor to eetabiish the Written criteria otiflined below, "the comer elevatan was used as the <br />model with the ewceptbn that the cast smhe use for the building entry was estimated, <br />Tha values are as folkYws: <br />1. RooF. Metal, architectural standing seam, painted, (Cobr to be <br />approved by the deyebper. <br />2. Brick Veneer- Color range as shown- <br />3 Brick Details (as they relate to fort I, face veneer of the building} <br />
The URL can be used to link to this page
Your browser does not support the video tag.