Browse
Search
2018-230-E AMS - Triangle Office Equipment Link Lower Level
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-230-E AMS - Triangle Office Equipment Link Lower Level
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 9:11:12 AM
Creation date
6/27/2018 2:20:57 PM
Metadata
Fields
Template:
Contract
Date
4/30/2018
Contract Starting Date
4/30/2018
Contract Ending Date
7/20/2018
Contract Document Type
Agreement - Construction
Amount
$161,298.00
Document Relationships
R 2018-230 AMS - Triangle Office Equipment Link Lower Level
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D3867B68- 8896- 4F81- AD20- BD4848A5FCD3 <br />by the State Treasurer pursuant to G. S. 147 - 86.58. <br />h. By executing this Agreement Contractor certifies that Contractor has not been identified, <br />and has not utilized the services of any agent or subcontractor identified, on the list created <br />by the State Treasurer pursuant to G. S. 147 - 86.81. <br />i. Contractor shall at all times remain in compliance with all applicable local, state, and <br />federal laws, rules, and regulations including but not limited to all state and federal non- <br />discrimination laws, policies, rules, and regulations and the Orange County Non - <br />Discrimination Policy and Orange County Living Wage Policy (each policy is incorporated <br />herein by reference and may be viewed at <br />http: / /www.oran eg countync. ov /departments /purchasing division/contracts.php). Any <br />violation of the Orange County Non - Discrimination Policy is a breach of this Agreement <br />and County may immediately terminate this Agreement without further obligation on the <br />part of the County. This paragraph is not intended to limit and does not limit the definition <br />of breach to discrimination. <br />j. This Agreement together with any amendments or modifications may be executed <br />electronically. All electronic signatures affixed hereto evidence the consent of the Parties <br />to utilize electronic signatures and intent of the Parties to comply with Article I IA and <br />Article 40 of North Carolina General Statute Chapter 66. <br />12. CONSEQUENTIAL AND LIQUIDATED DAMAGES <br />a. Owner and Contractor mutually waive any claim against each other for consequential <br />damages. Consequential Damages include: <br />i. Damages incurred by Owner for loss of use, income, financing, or business. <br />ii. Damages incurred by Contractor for office expenses, including personnel, loss of <br />financing, profit, income, business, damage to reputation, or any other non - direct <br />damages. <br />b. Liquidated damages shall be in accord with the Contract Documents. <br />13. TERMINATION OR SUSPENSION <br />a. The Owner may, without cause, order the Contractor to terminate, suspend, delay or <br />interrupt the Work in whole or in part for such period of time as the Owner may determine. <br />i. If Owner issues a written order to delay, suspend, or interrupt the Work, and such <br />order is not due to or as a result of any fault on the part of the Contractor or any <br />subcontractor, the Contractor may recover a per diem amount of five hundred <br />dollars ($500.00) per day with a not -to- exceed limit of ten thousand dollars <br />($10,000.00). <br />ii. In the event of termination by the Owner under this Agreement, the Contractor <br />shall be entitled to receive its reasonable and documented direct costs prior to <br />termination, including the cost of materials purchased for the Work which <br />purchases cannot be canceled or which material cannot reasonably be used by the <br />Contractor on other work, and the cost of closing down the work in a safe and <br />Revised 10/17 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.