Browse
Search
OUTBoard agenda 051618
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2018
>
OUTBoard agenda 051618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 4:25:40 PM
Creation date
6/25/2018 4:22:55 PM
Metadata
Fields
Template:
BOCC
Date
5/16/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 051618
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan (2008). <br />The original plan consisted of multiple access management strategies and was <br />completed with limited on -site analysis. However, this plan was instrumental in <br />gaining North Carolina Department of Transportation (NCDOT) acceptance and <br />participation in roadwork improvements necessary to serve the Morinaga Candy <br />Factory, which opened in 2016. Developments like this along with increased <br />residential growth in Hillsborough and commercial expansion in Mebane, especially <br />growth's impact on traffic, demonstrates the plan's importance. <br />A thorough existing conditions, environmental, and traffic analysis was conducted <br />through an engineering -based transportation study by Volkert Inc., based in Raleigh, <br />NC. This report reinforces the original Efland - Buckhorn- Mebane Access <br />Management Plan with a comprehensive investigation of the area's development <br />potential, traffic impact and recommended improvements. <br />The original Efland - Buckhorn- Mebane Access Management Plan should be updated <br />by incorporating the latest transportation study recommendations. <br />3. New Statutes and Rules <br />N/A <br />C. PROCESS <br />1. TIMEFRAME /MILESTONES /DEADLINES <br />a. BOCC Authorization to Proceed <br />April 3, 2018 <br />b. Planning Board Review: <br />October 3, 2018 <br />c. Public Hearin <br />November 1, 2018 (and possible decision <br />d. BOCC Updates /Checkpoints <br />October 3, 2018 (BOCC receives Planning Board agenda materials) <br />e. Other: <br />2. PUBLIC INVOLVEMENT PROGRAM <br />Mission /Scope: Public hearing process consistent with NC State Statutes and <br />Orange County ordinance requirements. Additionally, Planning staff is suggesting <br />one Community Meeting, held in early August 2018. Advertising for the Community <br />Meeting and Public Hearing will be by direct mailing to affected and surrounding <br />property owners, posting on the County website, and publishing notice in the local <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.