Browse
Search
BOA agenda 050718
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2018
>
BOA agenda 050718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 3:54:04 PM
Creation date
6/25/2018 3:52:03 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2018
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT 4/16/18 MINUTES <br />11 <br /> 388 389 <br />MOTION made by Randy Herman that the location and character of use will be in harmony with the area in 390 <br />which it is to be located. Susan Halkiotis seconded. 391 <br />VOTE: Unanimous 392 <br /> 393 <br />James Bryan: Two more things. The conditions and approve the permit. 394 <br /> 395 <br /> <br />RECOMMENDATION: <br /> <br /> <br />Staff has reviewed the application, the site plan, and all supporting documentation and has found <br />that the applicant complies with the application requirements, notice requirements, submittal <br />requirements for camp/retreat centers, specific standards of evaluation for camp/retreat centers, <br />and required regulations as outlined within the UDO <br /> <br />Staff has not received any evidence indicating the project does not comply with the UDO, including <br />the provisions of Section 5.3.2 (A) (2) inclusive, establishing the grounds for making a negative <br />finding on the general standards as detailed herein. These standards include maintaining or <br />promoting the public health, safety, and general welfare, maintaining or enhancing the value of <br />contiguous property, the use is in harmony with the area in which it is to be located, and the use <br />being in compliance with the general plan for the physical development of the County. <br /> <br />The Board could make an affirmative finding on this application provided the Board of Adjustment <br />finds in the affirmative on the specific standards of evaluation and general standards as detailed <br />herein, and no evidence is entered into the record demonstrating the applicant has either: <br />a. Failed to meet their burden of proof that the project complies with the specific development <br />standards for a telecommunication facility, or <br />b. Fails to comply with the general standards detailed within Section 5.3.2 (A) (2) of the UDO. <br />In the event that the Board makes an affirmative finding, and issues the permit, staff recommends <br />the attachment of the following conditions:
The URL can be used to link to this page
Your browser does not support the video tag.