Browse
Search
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:35:33 PM
Creation date
6/18/2018 9:43:19 AM
Metadata
Fields
Template:
Contract
Date
6/15/2018
Contract Starting Date
3/1/2017
Contract Ending Date
2/28/2022
Contract Document Type
Contract Amendment
Amount
$4,158.00
Document Relationships
2017-097-E SW - Draper Aden Associates, Inc. for engineering and environmental services
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-624-E Solid Waste - Draper Aden amendment 2
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-802-E Solid Waste - Scope of Work Draper Environmental Monitoring contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2018-210 Solid Waste - Draper Aden Associates long term planning scope
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1COFA69C- 6757 -43BD- 8570- E9C8F4DE644E <br />Section Four <br />Qualifications of Key Personnel <br />i <br />Ryan L. Sadler <br />Field Services <br />20 <br />Mr. Sadler has utilized his multi- faceted experience on numerous Civil Engineering <br />projects for counties, municipalities, and private enterprise. He has recently completed <br />projects in Harnett, Johnston, Carteret, Craven, Catawba, and Madison Counties <br />overseeing the construction administration of multiple construction projects for clients. <br />Mr. Sadler has been responsible for the generation of multiple Preliminary Engineering <br />Reports and Environmental Assessments while assisting with the obtaining of grant <br />funds for municipal utility and capital improvement projects. <br />7 years with the firm <br />Madison County Landfill Closure, Marshall, NC: Field Technician /Project <br />16 years of experience <br />Manager. Performed QA services for the 14 acre closure including testing of <br />Registration(s) <br />structural fill, 18 -inch clay cap, and 40 -mil LLDPE geosynthetics. Generated final <br />Education <br />CQC documents. <br />• B.S. /2000/ Env <br />Wayne County Landfill Phase 2 Expansion, Dudley, NC: Field Technician /Project <br />Science Policy <br />Stormwater Review Department, City of New Bern, NC: Member of Engineering <br />and Admin /North <br />team under contract with City of New Bern to review submitted Stormwater <br />Carolina State <br />Management and Nitrogen Removal Applications. <br />University <br />America) Catawba County Landfill Unit 2, Phase 2, Stage 2 Expansion, Newton, <br />• American Concrete NC: Performed CQA services for landfill expansion. Responsibilities included <br />Institute (ACI) Level 1 construction management and materials testing of this twenty -acre cell. The <br />• Nuclear Radiation closure consisted of a 24 -inch clay liner and a double 60 -mil liner installation. <br />Safety Training Contributed to final report. <br />Areas of Expertise <br />Lenoir County Landfill Phase 1 Expansion, LaGrange, NC: Field Technician/ <br />Professional <br />Project Manager. Performed contractor QC services for 10 acre new cell including <br />Registration(s) <br />testing of structural fill and 18 -inch clay liner. Generated final CQC documents. <br />• Manager of <br />geosynthetic clay liner, a 60 -mil HDPE synthetic liner, and geocomposite drainage <br />Landfill Operations <br />Wayne County Landfill Phase 2 Expansion, Dudley, NC: Field Technician /Project <br />Certification <br />Manager. Performed contractor QC services for 20 acre new cell including testing <br />#96545 (Solid Waste <br />of structural fill and 24 -inch clay liner. Generated final CQC documents. <br />Association of North <br />America) Catawba County Landfill Unit 2, Phase 2, Stage 2 Expansion, Newton, <br />• American Concrete NC: Performed CQA services for landfill expansion. Responsibilities included <br />Institute (ACI) Level 1 construction management and materials testing of this twenty -acre cell. The <br />• Nuclear Radiation closure consisted of a 24 -inch clay liner and a double 60 -mil liner installation. <br />Safety Training Contributed to final report. <br />Areas of Expertise <br />C.R.S.W.M.A., Tuscarora Landfill, IRL Closure, New Bern, North Carolina: CQA <br />• Regulatory <br />Field Technician. Responsible for installation of a geosynthetic liner extension <br />Compliance <br />and construction of a clay liner berm. Liner extension consisted of a layer of <br />• Engineering for Local <br />geosynthetic clay liner, a 60 -mil HDPE synthetic liner, and geocomposite drainage <br />Government and <br />layer. Responsible for the installation of geosynthetic cap (20 acres). Geosynthetic <br />Industry <br />cap consisted of a geosynthetic clay liner, a 30 -mil LLDPE geosynthetic liner, a <br />• Landfills, Transfer <br />geocomposite drainage layer, and 18 "of cover soil. <br />Stations <br />
The URL can be used to link to this page
Your browser does not support the video tag.