Browse
Search
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:35:33 PM
Creation date
6/18/2018 9:43:19 AM
Metadata
Fields
Template:
Contract
Date
6/15/2018
Contract Starting Date
3/1/2017
Contract Ending Date
2/28/2022
Contract Document Type
Contract Amendment
Amount
$4,158.00
Document Relationships
2017-097-E SW - Draper Aden Associates, Inc. for engineering and environmental services
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-624-E Solid Waste - Draper Aden amendment 2
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-802-E Solid Waste - Scope of Work Draper Environmental Monitoring contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2018-210 Solid Waste - Draper Aden Associates long term planning scope
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1COFA69C- 6757 -43BD- 8570- E9C8F4DE644E <br />Section Two <br />Experience <br />• Coordination with Blue Source, the County's carbon credit sales consultant <br />• Evaluation of PPEA proposals for LFG utilization <br />• Evaluation of small scale LFG utilization options <br />• Assistance with operational issues relative to the gas recovery system <br />• Assistance with the installation of solar utility flare / blower - flare at the landfill pump stations <br />Construction and CQA Services <br />• Construction phase services (including CQC / CQA and <br />surveying) for: <br />• Livingston landfill #1 double lined cell <br />• Livingston landfill #2 - Subtitle D cells 1 through 5 <br />• Closures of 4 landfills <br />• Partial closure of Livingston landfill #2 <br />Environmental and Groundwater Services <br />11 <br />Draper Aden Associates developed and managed the groundwater monitoring program for five landfill facilities. <br />A wide variety of services have been provided that encompass the entirety of Virginia's solid waste program, <br />from routine Detection Monitoring, to Corrective Action. Through successful management of the County's <br />program and proactive attention to environmental impacts and protection of nearby residents, the County has <br />developed an excellent relationship with the Virginia DEQ, and has resulted in significant cost savings. Services <br />have included: <br />• Development of the groundwater monitoring programs for all five landfills <br />• Alternate source demonstrations for several facilities and constituents <br />• Nature and extent studies <br />• Assessment of corrective measures, and development of corrective action plans <br />• Strategically placed active remediation system - successful. Identified a small, confined release through <br />the use of direct push technology, and established a focused remediation system <br />• Stormwater permitting <br />• Wetlands permitting <br />• SPCC plans <br />Landfill Groundwater Monitoring and Solid Waste <br />Engineering Services <br />Bedford County, Virginia <br />Draper Aden Associates began its work with Bedford County in <br />the late 1980s. <br />
The URL can be used to link to this page
Your browser does not support the video tag.